A platform for research: civil engineering, architecture and urbanism
The invention discloses a construction method of a garden road, and relates to the technical field of building construction, and the construction method comprises the following steps: excavating a roadbed, filling soil and tamping, laying a water seepage layer, laying a reinforcing layer, flattening, laying water permeable bricks, excavating a groove, assembling road edge stones, and laying the road edge stones. The construction method of the garden road is simple and rapid in step, good in continuity and high in construction efficiency, the structural strength of the garden road is effectively improved by erecting the reinforcing mesh, the garden road has better pressure bearing performance and shock resistance, the drainage channel can be opened through the control device when it rains by arranging the control device, and the construction efficiency of the garden road is improved. When it does not rain, the drainage channel can be opened and closed through the control device, external sundries are prevented from entering the drainage channel to cause blockage, and therefore the smooth drainage effect is always guaranteed.
本发明公开了一种园林道路的施工方法,涉及建筑施工技术领域,包括如下步骤:路基挖方、填土夯实、铺设渗水层、铺设加固层、平整处理、铺设透水砖、开挖沟槽、路沿石组装、铺设路沿石。本发明的园林道路的施工方法步骤简单快捷,连续性好,施工效率高,通过架设钢筋网,有效提升了园林道路的结构强度,使得园林道路具有更好的承压性和抗震性,通过设置控制装置,则在下雨时,可通过控制装置打开排水通道,即可实现顺畅排水,避免道路积水,而在未下雨时,则可通过控制装置打开封闭排水通道,避免外界杂物进入排水通道导致堵塞,从而始终保证顺畅的排水效果。
The invention discloses a construction method of a garden road, and relates to the technical field of building construction, and the construction method comprises the following steps: excavating a roadbed, filling soil and tamping, laying a water seepage layer, laying a reinforcing layer, flattening, laying water permeable bricks, excavating a groove, assembling road edge stones, and laying the road edge stones. The construction method of the garden road is simple and rapid in step, good in continuity and high in construction efficiency, the structural strength of the garden road is effectively improved by erecting the reinforcing mesh, the garden road has better pressure bearing performance and shock resistance, the drainage channel can be opened through the control device when it rains by arranging the control device, and the construction efficiency of the garden road is improved. When it does not rain, the drainage channel can be opened and closed through the control device, external sundries are prevented from entering the drainage channel to cause blockage, and therefore the smooth drainage effect is always guaranteed.
本发明公开了一种园林道路的施工方法,涉及建筑施工技术领域,包括如下步骤:路基挖方、填土夯实、铺设渗水层、铺设加固层、平整处理、铺设透水砖、开挖沟槽、路沿石组装、铺设路沿石。本发明的园林道路的施工方法步骤简单快捷,连续性好,施工效率高,通过架设钢筋网,有效提升了园林道路的结构强度,使得园林道路具有更好的承压性和抗震性,通过设置控制装置,则在下雨时,可通过控制装置打开排水通道,即可实现顺畅排水,避免道路积水,而在未下雨时,则可通过控制装置打开封闭排水通道,避免外界杂物进入排水通道导致堵塞,从而始终保证顺畅的排水效果。
Construction method of garden road
一种园林道路的施工方法
CHEN HONGJIANG (author)
2023-10-13
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE