Fabricated superposed slab laying construction technology
The invention relates to a fabricated superposed slab laying construction technology. The fabricated superposed slab laying construction technology adopts a following superposed slab laying construction device. The superposed slab laying construction device comprises an upper supporting plate, a fixing column, a telescoping column, a stretching spring, auxiliary correction plates, a shape correction support, shape correction mechanisms and travelling supporting plates. The construction technology of adopting the superposed slab laying construction device to conduct superposed slab laying operation comprises the following steps that S1, a prefabricated wallboard is placed; S2, the prefabricated wallboard is subjected to grouting; S3, a superposed beam is installed; S4, a superposed slab islaid; S5, superposed slab rebars are subjected to shape correction; and S6, the superposed slab rebars are bundled. The fabricated superposed slab laying construction technology can solve the problemsthat in the prior art, when reserved rebars of the superposed slab and the prefabricated wallboard are subjected to shape correction treatment, due to the facts that the manual straightening efficiency of the reserved rebars is low, and calibration is not conducted in the rebar straightening process, the rebar shape correction effect is poor, the reserved rebars cannot be subjected to synchronousshape correction treatment, and the arc-shaped structures of hook-shaped rebars cannot be subjected to shape correction.
本发明涉及一种装配式叠合板铺装施工工艺,该叠合板铺装施工工艺采用如下叠合板铺装施工装置,该叠合板铺装施工装置包括上支板、固定柱、伸缩柱、伸缩弹簧、辅正板、矫形支架、矫形机构和行走支板;采用上述叠合板铺装施工装置对叠合板铺装的施工工艺,包括以下步骤:S1、预制墙板放置;S2、预制墙板灌浆;S3、叠合梁安装;S4、叠合板铺放;S5、叠合板钢筋矫形;S6、叠合板钢筋捆扎。本发明可以解决现有对叠合板与预制墙板的预留钢筋进行矫形处理时存在的:人工对预留钢筋进行扳直效率较低,且钢筋扳直无校准,从而造成钢筋矫形效果较差,预留钢筋无法进行同步矫形处理,针对钩形钢筋无法对其弧形结构进行矫形等问题。
Fabricated superposed slab laying construction technology
The invention relates to a fabricated superposed slab laying construction technology. The fabricated superposed slab laying construction technology adopts a following superposed slab laying construction device. The superposed slab laying construction device comprises an upper supporting plate, a fixing column, a telescoping column, a stretching spring, auxiliary correction plates, a shape correction support, shape correction mechanisms and travelling supporting plates. The construction technology of adopting the superposed slab laying construction device to conduct superposed slab laying operation comprises the following steps that S1, a prefabricated wallboard is placed; S2, the prefabricated wallboard is subjected to grouting; S3, a superposed beam is installed; S4, a superposed slab islaid; S5, superposed slab rebars are subjected to shape correction; and S6, the superposed slab rebars are bundled. The fabricated superposed slab laying construction technology can solve the problemsthat in the prior art, when reserved rebars of the superposed slab and the prefabricated wallboard are subjected to shape correction treatment, due to the facts that the manual straightening efficiency of the reserved rebars is low, and calibration is not conducted in the rebar straightening process, the rebar shape correction effect is poor, the reserved rebars cannot be subjected to synchronousshape correction treatment, and the arc-shaped structures of hook-shaped rebars cannot be subjected to shape correction.
本发明涉及一种装配式叠合板铺装施工工艺,该叠合板铺装施工工艺采用如下叠合板铺装施工装置,该叠合板铺装施工装置包括上支板、固定柱、伸缩柱、伸缩弹簧、辅正板、矫形支架、矫形机构和行走支板;采用上述叠合板铺装施工装置对叠合板铺装的施工工艺,包括以下步骤:S1、预制墙板放置;S2、预制墙板灌浆;S3、叠合梁安装;S4、叠合板铺放;S5、叠合板钢筋矫形;S6、叠合板钢筋捆扎。本发明可以解决现有对叠合板与预制墙板的预留钢筋进行矫形处理时存在的:人工对预留钢筋进行扳直效率较低,且钢筋扳直无校准,从而造成钢筋矫形效果较差,预留钢筋无法进行同步矫形处理,针对钩形钢筋无法对其弧形结构进行矫形等问题。
Fabricated superposed slab laying construction technology
一种装配式叠合板铺装施工工艺
ZHAO YULING (author) / XU HUI (author)
2020-04-21
Patent
Electronic Resource
Chinese
Construction method of fabricated concrete superposed beam
European Patent Office | 2024
|European Patent Office | 2021
|Fabricated prefabricated superposed beam connecting structure and construction method thereof
European Patent Office | 2021
|Composite thermal insulation space superposed truss floor slab and construction method thereof
European Patent Office | 2022
|