A platform for research: civil engineering, architecture and urbanism
Fabricated construction elevator foundation and construction method
The invention discloses a fabricated construction elevator foundation. The fabricated construction elevator foundation comprises two parallelly-arranged main steel beams, the two ends of each main steel beam are fixedly connected with embedded parts arranged on a concrete plate or a vertical shear wall correspondingly, two parallel auxiliary steel beams are installed between the tops of the two main steel beams, and steel brackets are installed on the auxiliary steel beams. The main steel beams and the auxiliary steel beams preferably adopt box steel beams. The invention further discloses a construction method of the fabricated construction elevator foundation. The construction method comprises four steps. The fabricated construction elevator foundation can be quickly installed, influenceon construction progress is reduced, after a construction elevator is dismantled, construction waste is not generated, and the environment-friendly non-pollution effect is achieved; and all the partscan be recycled, and the construction cost is reduced.
本发明公开了一种装配式施工电梯基础,包括两个平行设置主钢梁,所述主钢梁的两端分别与设置在混凝土板上或竖向剪力墙上的预埋件固接,两个主钢梁的顶部之间安装有两个平行的次钢梁,所述次钢梁上安装有钢支架。所述主钢梁及次钢梁均优选采为箱型钢梁。本发明还公开了上述装配式施工电梯基础的施工方法,包括4个步骤。本发明的装配式施工电梯基础可快速安装,减小了对施工进度的影响;拆除施工电梯后,不会产生建筑垃圾,环保无污染;所有部件均可循环利用,节约了施工成本。
Fabricated construction elevator foundation and construction method
The invention discloses a fabricated construction elevator foundation. The fabricated construction elevator foundation comprises two parallelly-arranged main steel beams, the two ends of each main steel beam are fixedly connected with embedded parts arranged on a concrete plate or a vertical shear wall correspondingly, two parallel auxiliary steel beams are installed between the tops of the two main steel beams, and steel brackets are installed on the auxiliary steel beams. The main steel beams and the auxiliary steel beams preferably adopt box steel beams. The invention further discloses a construction method of the fabricated construction elevator foundation. The construction method comprises four steps. The fabricated construction elevator foundation can be quickly installed, influenceon construction progress is reduced, after a construction elevator is dismantled, construction waste is not generated, and the environment-friendly non-pollution effect is achieved; and all the partscan be recycled, and the construction cost is reduced.
本发明公开了一种装配式施工电梯基础,包括两个平行设置主钢梁,所述主钢梁的两端分别与设置在混凝土板上或竖向剪力墙上的预埋件固接,两个主钢梁的顶部之间安装有两个平行的次钢梁,所述次钢梁上安装有钢支架。所述主钢梁及次钢梁均优选采为箱型钢梁。本发明还公开了上述装配式施工电梯基础的施工方法,包括4个步骤。本发明的装配式施工电梯基础可快速安装,减小了对施工进度的影响;拆除施工电梯后,不会产生建筑垃圾,环保无污染;所有部件均可循环利用,节约了施工成本。
Fabricated construction elevator foundation and construction method
一种装配式施工电梯基础及施工方法
TAN YINGHUI (author) / YAN YANJUN (author) / YANG WANFENG (author) / DENG YONGPING (author) / SONG ZIJIE (author) / HU YI (author)
2020-04-28
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Single-foundation construction elevator foundation and construction method
European Patent Office | 2024
|Elevator foundation pit structure and elevator foundation pit construction method
European Patent Office | 2024
|Construction elevator foundation construction method using bottom plate
European Patent Office | 2024
|Construction method of sunken construction elevator foundation structure
European Patent Office | 2022
|