Construction elevator foundation construction method using bottom plate
The invention relates to a construction elevator foundation construction method utilizing a bottom plate, which comprises the following steps: surveying and setting out, determining the mounting position of a construction elevator, and marking the positions of bolt holes on a corresponding construction elevator underframe on a protective layer at the bottom of the bottom plate by using red paint; binding construction of bottom plate reinforcing steel bars; burying tower crane base underframe connecting bolts; steel plates are pre-buried, and steel plate preformed holes are formed; steel bar stirrups are embedded; arranging a water collecting pit; pouring bottom plate concrete; plastering bottom plate concrete and making a slope; and installing the construction elevator. According to the construction elevator foundation construction method using the bottom plate, the bolts are directly embedded in the bottom plate for a building which is high in basement vertical transportation requirement and needs to penetrate through the bottom plate, the bottom plate structure is used as the construction elevator foundation, resources can be saved to a great extent, and construction is facilitated.
本发明涉及一种利用底板的施工电梯基础施工方法,包括:测量放线,确定施工电梯的安装位置,在底板底部的保护层上用红油漆标识出对应的施工电梯底架上的螺栓孔位置;底板钢筋绑扎施工;埋设塔吊基座底架连接螺栓;预埋钢板并开设钢板预留孔;预埋钢筋马镫;设置集水坑;底板混凝土浇筑;底板混凝土抹面找坡;安装施工电梯。本发明的利用底板的施工电梯基础施工方法,针对地下室垂直运输要求高、需要穿板的建筑,直接在底板上预埋螺栓,利用底板结构作为施工电梯基础,可以极大程度节约资源,并且便于施工。
Construction elevator foundation construction method using bottom plate
The invention relates to a construction elevator foundation construction method utilizing a bottom plate, which comprises the following steps: surveying and setting out, determining the mounting position of a construction elevator, and marking the positions of bolt holes on a corresponding construction elevator underframe on a protective layer at the bottom of the bottom plate by using red paint; binding construction of bottom plate reinforcing steel bars; burying tower crane base underframe connecting bolts; steel plates are pre-buried, and steel plate preformed holes are formed; steel bar stirrups are embedded; arranging a water collecting pit; pouring bottom plate concrete; plastering bottom plate concrete and making a slope; and installing the construction elevator. According to the construction elevator foundation construction method using the bottom plate, the bolts are directly embedded in the bottom plate for a building which is high in basement vertical transportation requirement and needs to penetrate through the bottom plate, the bottom plate structure is used as the construction elevator foundation, resources can be saved to a great extent, and construction is facilitated.
本发明涉及一种利用底板的施工电梯基础施工方法,包括:测量放线,确定施工电梯的安装位置,在底板底部的保护层上用红油漆标识出对应的施工电梯底架上的螺栓孔位置;底板钢筋绑扎施工;埋设塔吊基座底架连接螺栓;预埋钢板并开设钢板预留孔;预埋钢筋马镫;设置集水坑;底板混凝土浇筑;底板混凝土抹面找坡;安装施工电梯。本发明的利用底板的施工电梯基础施工方法,针对地下室垂直运输要求高、需要穿板的建筑,直接在底板上预埋螺栓,利用底板结构作为施工电梯基础,可以极大程度节约资源,并且便于施工。
Construction elevator foundation construction method using bottom plate
一种利用底板的施工电梯基础施工方法
TAN YUNFEI (author) / WEI SHICHUN (author) / FU WEICAI (author) / ZHOU XINGHU (author) / XU JUN (author) / LIANG GUOMING (author) / CHEN YUNYANG (author) / DENG ZHIZAN (author)
2024-02-06
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Single-foundation construction elevator foundation and construction method
European Patent Office | 2024
|Fabricated construction elevator foundation and construction method
European Patent Office | 2020
|Elevator foundation pit structure and elevator foundation pit construction method
European Patent Office | 2024
|Foundation pit bottom plate support changing construction method
European Patent Office | 2023
|