The invention provides a snowmobile sled track galling process. The process comprises steps that a track comprises a plurality of construction positions, the galling sequence of the construction positions is determined according to the finishing sequence of finish machining of the construction positions, and the galling sequence of the construction positions is the same as the finish machining sequence of the construction positions; after finish machining of all the construction positions is completed and before initial solidification of concrete of all the construction positions is completed,galling is conducted on all the construction positions. The process is advantaged in that according to the sequence of finish machining completion of all construction positions of the snowmobile sledtrack, a solidification state of the sprayed concrete after finish machining is considered, the galling sequence is arranged, in this way, galling can be conducted in the first time in the state thatthe racing track concrete is suitable for galling, the construction space of galling personnel before and after galling is not affected by construction of other procedures, construction of the otherprocedures is not affected, procedures are reasonably inserted, construction efficiency is improved, the construction requirement can be met, and a large amount of time and cost can be saved.
本发明提供了一种雪车雪橇赛道拉毛工艺,包括步骤:赛道包括多个的施工位置,根据各施工位置的精加工完成的先后顺序确定各施工位置的拉毛顺序,并且,各施工位置的拉毛顺序与各施工位置的精加工顺序相同;在各施工位置的精加工完成之后,并在各施工位置的混凝土初凝完成之前,对各施工位置进行拉毛。根据雪车雪橇赛道的各个施工位置的精加工完成的先后顺序,并考虑喷射混凝土精加工完成后的凝固状态,来安排拉毛的先后顺序,这样做可以实现在赛道混凝土适合拉毛的状态时间内第一时间拉毛,做到拉毛前后拉毛人员的施工空间不受其它工序施工影响,也不影响其他工序施工,工序合理穿插,提高施工效率,既能达到施工要求,又能节约大量的时间和成本。
Snowmobile sled track galling process
The invention provides a snowmobile sled track galling process. The process comprises steps that a track comprises a plurality of construction positions, the galling sequence of the construction positions is determined according to the finishing sequence of finish machining of the construction positions, and the galling sequence of the construction positions is the same as the finish machining sequence of the construction positions; after finish machining of all the construction positions is completed and before initial solidification of concrete of all the construction positions is completed,galling is conducted on all the construction positions. The process is advantaged in that according to the sequence of finish machining completion of all construction positions of the snowmobile sledtrack, a solidification state of the sprayed concrete after finish machining is considered, the galling sequence is arranged, in this way, galling can be conducted in the first time in the state thatthe racing track concrete is suitable for galling, the construction space of galling personnel before and after galling is not affected by construction of other procedures, construction of the otherprocedures is not affected, procedures are reasonably inserted, construction efficiency is improved, the construction requirement can be met, and a large amount of time and cost can be saved.
本发明提供了一种雪车雪橇赛道拉毛工艺,包括步骤:赛道包括多个的施工位置,根据各施工位置的精加工完成的先后顺序确定各施工位置的拉毛顺序,并且,各施工位置的拉毛顺序与各施工位置的精加工顺序相同;在各施工位置的精加工完成之后,并在各施工位置的混凝土初凝完成之前,对各施工位置进行拉毛。根据雪车雪橇赛道的各个施工位置的精加工完成的先后顺序,并考虑喷射混凝土精加工完成后的凝固状态,来安排拉毛的先后顺序,这样做可以实现在赛道混凝土适合拉毛的状态时间内第一时间拉毛,做到拉毛前后拉毛人员的施工空间不受其它工序施工影响,也不影响其他工序施工,工序合理穿插,提高施工效率,既能达到施工要求,又能节约大量的时间和成本。
Snowmobile sled track galling process
雪车雪橇赛道拉毛工艺
HAI YOUGUI (author) / ZHOU CAOGUO (author) / LU TAO (author) / LIN TAO (author) / SHI YUEWEI (author) / LIU DONG (author) / YU WEIYONG (author) / YANG YI (author)
2020-05-05
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Side sunshade for snowmobile sleigh racing track and snowmobile sleigh building system
European Patent Office | 2023
|Snowmobile sleigh racing track transformation racing track and racing track transformation system
European Patent Office | 2024
|Rocket sled slide rail seamless track construction method
European Patent Office | 2021
|