Protection construction equipment for hydropower station gate and construction method thereof
The invention discloses protection construction equipment for a hydropower station gate. The protection construction equipment for the hydropower station gate comprises a main beam plate; a left supporting frame and a right supporting frame are mounted on the left side and the right side of the lower end of the main beam plate respectively; a construction material transporting device is mounted onthe right side of the right supporting frame; the rear side of the main beam plate is connected with a movable beam plate; and a gate independent transporting device is mounted on the right side of the lower end of the movable beam plate. In the protection construction equipment for the hydropower station gate, a construction material can be transported to a position where construction is required safely and accurately through the joint cooperation of the main beam plate, a first motor, a first threaded rod and the construction material transporting device; the overall process is safe and stable; the gate can be kept in a vertical state and can be transported to the position where the gate is required to be mounted through the joint cooperation of the movable beam plate, a first worm wheel, a first worm, a second threaded rod, a third threaded rod, a second motor, a third motor and the gate independent transporting device, so that the positioning mounting construction of the gate is facilitated; the gate and other construction materials are transported separately in a safe and orderly manner; the construction is facilitated; and the construction efficiency is greatly improved.
本发明公开了一种水电站闸门防护施工设备,包括主横梁板,主横梁板下端左右两侧分别安装有左支撑架、右支撑架,右支撑架右侧安装有施工材料运输装置,主横梁板后侧连接有活动横梁板,活动横梁板下端右侧安装有闸门独立运输装置。在本发明中,通过主横梁板、第一电机、第一螺纹杆、施工材料运输装置的共同配合能够将施工材料安全、准确地输送到需要施工的位置,整个过程安全、稳定,通过活动横梁板、第一涡轮、第一蜗杆、第二螺纹杆、第三螺纹杆、第二电机、第三电机、闸门独立运输装置的共同配合能够使闸门保持竖直状态准确输送到需要安装的位置,方便闸门的定位安装施工,闸门与其他施工材料分开输送,安全有序,方便施工,大大提高了施工效率。
Protection construction equipment for hydropower station gate and construction method thereof
The invention discloses protection construction equipment for a hydropower station gate. The protection construction equipment for the hydropower station gate comprises a main beam plate; a left supporting frame and a right supporting frame are mounted on the left side and the right side of the lower end of the main beam plate respectively; a construction material transporting device is mounted onthe right side of the right supporting frame; the rear side of the main beam plate is connected with a movable beam plate; and a gate independent transporting device is mounted on the right side of the lower end of the movable beam plate. In the protection construction equipment for the hydropower station gate, a construction material can be transported to a position where construction is required safely and accurately through the joint cooperation of the main beam plate, a first motor, a first threaded rod and the construction material transporting device; the overall process is safe and stable; the gate can be kept in a vertical state and can be transported to the position where the gate is required to be mounted through the joint cooperation of the movable beam plate, a first worm wheel, a first worm, a second threaded rod, a third threaded rod, a second motor, a third motor and the gate independent transporting device, so that the positioning mounting construction of the gate is facilitated; the gate and other construction materials are transported separately in a safe and orderly manner; the construction is facilitated; and the construction efficiency is greatly improved.
本发明公开了一种水电站闸门防护施工设备,包括主横梁板,主横梁板下端左右两侧分别安装有左支撑架、右支撑架,右支撑架右侧安装有施工材料运输装置,主横梁板后侧连接有活动横梁板,活动横梁板下端右侧安装有闸门独立运输装置。在本发明中,通过主横梁板、第一电机、第一螺纹杆、施工材料运输装置的共同配合能够将施工材料安全、准确地输送到需要施工的位置,整个过程安全、稳定,通过活动横梁板、第一涡轮、第一蜗杆、第二螺纹杆、第三螺纹杆、第二电机、第三电机、闸门独立运输装置的共同配合能够使闸门保持竖直状态准确输送到需要安装的位置,方便闸门的定位安装施工,闸门与其他施工材料分开输送,安全有序,方便施工,大大提高了施工效率。
Protection construction equipment for hydropower station gate and construction method thereof
一种水电站闸门防护施工设备及其施工方法
DONG CHUANQIANG (author) / MA XINXI (author) / YAO HUIYONG (author) / HUANG SHENGLI (author) / XING LONG (author) / DU SEN (author) / ZHU CHANGGUANG (author) / SONG HUANHUAN (author) / ZHOU RAN (author) / YANG WEN (author)
2020-05-08
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Building hydropower construction safety protection equipment and use method thereof
European Patent Office | 2022
|Building hydropower construction safety protection equipment and use method thereof
European Patent Office | 2023
|Hydropower station workshop cofferdam structure and construction method thereof
European Patent Office | 2022
|Construction method of hydropower station traffic tunnels
European Patent Office | 2020
|Hydropower station dam body leaking stoppage construction method