Fabricated retaining wall for constructing sponge city
The invention discloses a fabricated retaining wall for constructing a sponge city, and relates to the technical field of greenery landscape. The problems that the manufacturing and hoisting difficulty of the retaining wall is high, the interior of the retaining wall is likely to be abraded, and the water storage volume is small are solved. The fabricated retaining wall comprises an embedded base;two first soil retaining blocks are fixedly mounted at the top of the embedded base. Two third soil retaining blocks are fixedly mounted at the tops of two second soil retaining blocks are correspondingly. When the fabricated retaining wall is manufactured, it is only needed to pour the embedded base, the first soil retaining blocks, the two soil retaining blocks, the third soil retaining blocksand fourth soil retaining blocks correspondingly; when the device needs to be assembled at the position needing soil retaining, an impounding reservoir is firstly fixed to be underground, then the embedded base is fixed to above the impounding reservoir and fixed with concrete, then the first soil retaining blocks, the second soil retaining blocks, the third soil retaining blocks and the fourth soil retaining blocks are placed upwards in sequence, and then a complete soil retaining wall can be formed; and due to the fact that the device is of an assembled structure, the manufacturing and the hoisting difficulty is greatly reduced.
本发明公开了一种构建海绵城市的装配式挡土墙,涉及绿化景观技术领域,解决了挡土墙制作和吊装时难度高,内部易磨损,蓄水容量小的问题,包括预埋底座;所述预埋底座的顶部固定安装有两块一号挡土块;两块二号挡土块的顶部均固定安装有一块三号挡土块。在制作本装置时,只需要通过专用的模具将预埋底座、一号挡土块、二号挡土块、三号挡土块和四号挡土块分别进行浇筑,在需要挡土的位置组装本装置时,先将蓄水池固定在地底,然后将预埋底座固定在蓄水池上方并使用混凝土固定,再将一号挡土块、二号挡土块、三号挡土块和四号挡土块依次向上放置,然后即可组成一个完整的挡土墙,因为本装置是组装式结构,所以制作和吊装时的难度将会大大降低。
Fabricated retaining wall for constructing sponge city
The invention discloses a fabricated retaining wall for constructing a sponge city, and relates to the technical field of greenery landscape. The problems that the manufacturing and hoisting difficulty of the retaining wall is high, the interior of the retaining wall is likely to be abraded, and the water storage volume is small are solved. The fabricated retaining wall comprises an embedded base;two first soil retaining blocks are fixedly mounted at the top of the embedded base. Two third soil retaining blocks are fixedly mounted at the tops of two second soil retaining blocks are correspondingly. When the fabricated retaining wall is manufactured, it is only needed to pour the embedded base, the first soil retaining blocks, the two soil retaining blocks, the third soil retaining blocksand fourth soil retaining blocks correspondingly; when the device needs to be assembled at the position needing soil retaining, an impounding reservoir is firstly fixed to be underground, then the embedded base is fixed to above the impounding reservoir and fixed with concrete, then the first soil retaining blocks, the second soil retaining blocks, the third soil retaining blocks and the fourth soil retaining blocks are placed upwards in sequence, and then a complete soil retaining wall can be formed; and due to the fact that the device is of an assembled structure, the manufacturing and the hoisting difficulty is greatly reduced.
本发明公开了一种构建海绵城市的装配式挡土墙,涉及绿化景观技术领域,解决了挡土墙制作和吊装时难度高,内部易磨损,蓄水容量小的问题,包括预埋底座;所述预埋底座的顶部固定安装有两块一号挡土块;两块二号挡土块的顶部均固定安装有一块三号挡土块。在制作本装置时,只需要通过专用的模具将预埋底座、一号挡土块、二号挡土块、三号挡土块和四号挡土块分别进行浇筑,在需要挡土的位置组装本装置时,先将蓄水池固定在地底,然后将预埋底座固定在蓄水池上方并使用混凝土固定,再将一号挡土块、二号挡土块、三号挡土块和四号挡土块依次向上放置,然后即可组成一个完整的挡土墙,因为本装置是组装式结构,所以制作和吊装时的难度将会大大降低。
Fabricated retaining wall for constructing sponge city
一种构建海绵城市的装配式挡土墙
JI KUN (author) / XUN JIANWEI (author) / ZHU YAN (author) / SU PING (author) / SANG KUNJIA (author)
2020-05-12
Patent
Electronic Resource
Chinese