A platform for research: civil engineering, architecture and urbanism
Concrete pouring device for concrete-filled steel tube pile
The invention discloses a concrete pouring device for a concrete-filled steel tube pile, and belongs to the technical field of civil engineering construction equipment. The concrete pouring device comprises a concrete pouring bearing platform, a grouting guide pipe, a lifting seat, a concrete pump and a stirring tank; a support column is welded to the upper end of the concrete pouring bearing platform, the support column is provided with the lifting seat, and the lifting seat is internally provided with a lifting sleeve; the grouting guide pipe is arranged in the lifting sleeve in a penetrating mode, and the top of the grouting guide pipe is connected with the concrete pump through a connecting guide pipe; and the concrete pump is connected with the stirring tank, and the stirring tank isarranged on a pouring trolley. According to the device, concrete in the stirring tank is conveniently pumped into the grouting guide pipe and a pile position hole, the pouring process of a concrete-filled steel tube pile and a concrete stand column is formed, construction difficulty is reduced; and the stability is good during concrete pouring, the construction requirement for high efficiency is met, the construction cost is saved, the construction cost is reduced, grouting operation can be well carried out, and the device is suitable for continuous construction of the concrete-filled steel tube pile.
本发明公开了一种用于钢管混凝土桩的混凝土浇筑装置,属于土建施工设备技术领域,包括混凝土浇筑承台、注浆导管、提升座、混凝土泵和搅拌罐,所述混凝土浇筑承台上端焊接有支撑立柱,支撑立柱上安装有提升座,提升座内设有提升套,提升套内穿设有注浆导管,注浆导管顶部通过连接导管连接混凝土泵,混凝土泵连接搅拌罐,搅拌罐设置在浇筑小车上,方便将搅拌罐内的混凝土泵入注浆导管并泵入桩位孔内,形成钢管混凝土桩,混凝土立柱的浇筑流程,减小了施工难度,混凝土浇筑时的稳定性好,既满足了高效率的施工要求,节约了施工成本,降低了工程造价,又能很好的进行注浆操作,适用于钢管混凝土桩的连续施工使用。
Concrete pouring device for concrete-filled steel tube pile
The invention discloses a concrete pouring device for a concrete-filled steel tube pile, and belongs to the technical field of civil engineering construction equipment. The concrete pouring device comprises a concrete pouring bearing platform, a grouting guide pipe, a lifting seat, a concrete pump and a stirring tank; a support column is welded to the upper end of the concrete pouring bearing platform, the support column is provided with the lifting seat, and the lifting seat is internally provided with a lifting sleeve; the grouting guide pipe is arranged in the lifting sleeve in a penetrating mode, and the top of the grouting guide pipe is connected with the concrete pump through a connecting guide pipe; and the concrete pump is connected with the stirring tank, and the stirring tank isarranged on a pouring trolley. According to the device, concrete in the stirring tank is conveniently pumped into the grouting guide pipe and a pile position hole, the pouring process of a concrete-filled steel tube pile and a concrete stand column is formed, construction difficulty is reduced; and the stability is good during concrete pouring, the construction requirement for high efficiency is met, the construction cost is saved, the construction cost is reduced, grouting operation can be well carried out, and the device is suitable for continuous construction of the concrete-filled steel tube pile.
本发明公开了一种用于钢管混凝土桩的混凝土浇筑装置,属于土建施工设备技术领域,包括混凝土浇筑承台、注浆导管、提升座、混凝土泵和搅拌罐,所述混凝土浇筑承台上端焊接有支撑立柱,支撑立柱上安装有提升座,提升座内设有提升套,提升套内穿设有注浆导管,注浆导管顶部通过连接导管连接混凝土泵,混凝土泵连接搅拌罐,搅拌罐设置在浇筑小车上,方便将搅拌罐内的混凝土泵入注浆导管并泵入桩位孔内,形成钢管混凝土桩,混凝土立柱的浇筑流程,减小了施工难度,混凝土浇筑时的稳定性好,既满足了高效率的施工要求,节约了施工成本,降低了工程造价,又能很好的进行注浆操作,适用于钢管混凝土桩的连续施工使用。
Concrete pouring device for concrete-filled steel tube pile
一种用于钢管混凝土桩的混凝土浇筑装置
CHEN ERPING (author) / SUN WU (author) / WU JIKUN (author) / SUN YUFENG (author) / LIANG ZHE (author) / ZHU JIE (author) / ZHAO BENCHAO (author) / LI ZHAO (author) / LI QIHONG (author) / GAO BAOJIAN (author)
2020-05-19
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Concrete pouring method of concrete filled steel tube iron tower
European Patent Office | 2015
|Concrete-filled steel tube arch rib, pouring equipment and pouring method
European Patent Office | 2022
|European Patent Office | 2021
|Concrete-filled steel tube structure, pouring method, concrete material and building
European Patent Office | 2022
|