A platform for research: civil engineering, architecture and urbanism
The invention discloses a set-shaped steel formwork for construction of a concrete pier column structure and a construction method, and belongs to the technical field of concrete column construction.The set-shaped steel formwork comprises a steel formwork and a plurality of formwork connectors, wherein the steel formwork is vertically arranged to form a concrete pier column main structure, each formwork connector comprises a first connecting unit, a second connecting unit and two connecting assemblies, the first connecting unit and the second connecting unit are vertically staggered and centrally symmetric, the first connecting unit and the second connecting unit are connected through the two connecting assemblies to form a hoop body, and the hoop body is used for fixing and clamping theconcrete pier column main structure formed by the steel formwork. The set-shaped steel formwork is convenient and fast to mount and dismount, convenient to maintain, low in construction cost and longin service life, can be repeatedly used, and can effectively produce foam, thereby guaranteeing pouring quality of concrete.
本发明公开了一种混凝土墩柱结构施工用定型钢模板及施工方法,属于混凝土柱施工的技术领域。包括钢模板和若干组模板连接器,所述钢模板竖直设置形成混凝土墩柱主体结构,每组所述模板连接器均包括第一连接单元、第二连接单元和两个连接组件,所述第一连接单元和第二连接单元呈上下交错、中心对称设置,第一连接单元和第二连接单元通过两个连接组件连接成箍状体,所述箍状体用于固定夹紧钢模板形成的混凝土墩柱主体结构。安装与拆卸方便快捷,维修方便,施工成本低,使用寿命长,可重复使用,还能有效地实现气泡的产生,进而保证其混凝土的浇筑质量。
The invention discloses a set-shaped steel formwork for construction of a concrete pier column structure and a construction method, and belongs to the technical field of concrete column construction.The set-shaped steel formwork comprises a steel formwork and a plurality of formwork connectors, wherein the steel formwork is vertically arranged to form a concrete pier column main structure, each formwork connector comprises a first connecting unit, a second connecting unit and two connecting assemblies, the first connecting unit and the second connecting unit are vertically staggered and centrally symmetric, the first connecting unit and the second connecting unit are connected through the two connecting assemblies to form a hoop body, and the hoop body is used for fixing and clamping theconcrete pier column main structure formed by the steel formwork. The set-shaped steel formwork is convenient and fast to mount and dismount, convenient to maintain, low in construction cost and longin service life, can be repeatedly used, and can effectively produce foam, thereby guaranteeing pouring quality of concrete.
本发明公开了一种混凝土墩柱结构施工用定型钢模板及施工方法,属于混凝土柱施工的技术领域。包括钢模板和若干组模板连接器,所述钢模板竖直设置形成混凝土墩柱主体结构,每组所述模板连接器均包括第一连接单元、第二连接单元和两个连接组件,所述第一连接单元和第二连接单元呈上下交错、中心对称设置,第一连接单元和第二连接单元通过两个连接组件连接成箍状体,所述箍状体用于固定夹紧钢模板形成的混凝土墩柱主体结构。安装与拆卸方便快捷,维修方便,施工成本低,使用寿命长,可重复使用,还能有效地实现气泡的产生,进而保证其混凝土的浇筑质量。
Set-shaped steel formwork for construction of concrete pier column structure and construction method
一种混凝土墩柱结构施工用定型钢模板及施工方法
WU CHUYU (author)
2020-06-09
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Pier column fair-faced concrete construction method, pier column and steel formwork structure
European Patent Office | 2024
|Formwork and construction method for bridge formwork turnover pier column construction
European Patent Office | 2023
|Formwork structure for bridge construction and pier column construction method
European Patent Office | 2023
|Steel-UHPC combined formwork core-filled concrete pier column and construction method thereof
European Patent Office | 2024
|Formwork removal method for bridge pier column formwork turnover construction
European Patent Office | 2024
|