A platform for research: civil engineering, architecture and urbanism
Pier column fair-faced concrete construction method, pier column and steel formwork structure
The invention relates to the technical field of pier column construction, and provides a pier column fair-faced concrete construction method, a pier column and a steel formwork structure.The method comprises the following steps that formwork matching design is conducted firstly, a factory conducts production and trial splicing of the steel formwork structure on the basis of the formwork matching design, and the generated steel formwork structure is subjected to on-site splicing and formwork closing reinforcement; if the template is not qualified, returning to the previous step until the template passes the acceptance; and finally, concrete is poured, and film covering curing is conducted. The pier column pouring cavity is formed by folding the spliced steel formwork structures, and compared with a traditional wood formwork, the steel formwork structures are more in turnover frequency, and cost is saved. And common quality problems such as template splicing seams, slab staggering and deflection can be effectively eliminated. The forming quality of the concrete pier column is good, the effect of bare concrete can be achieved after form stripping, additional decoration is not needed, the concrete forming surface is smooth, bubbles are few, the color is uniform, and formwork abutted seams are few.
本申请涉及墩柱施工技术领域,提供了一种墩柱清水混凝土施工方法、墩柱及钢模板结构,方法包括以下步骤:先进行配模设计,工厂再基于配模设计,进行钢模板结构的生产、试拼,将生成的钢模板结构进行现场拼装、合模加固;再进行模板吊装和验收,若验收不合格,则返回上一步,直至验收通过;最后浇筑混凝土,进行覆膜养护。通过拼接的钢模板结构合拢形成墩柱浇筑腔,与传统木模板比较,钢模板结构的周转次数多,节约成本。可有效的消除模板拼缝、错台、偏斜等质量通病的发生。混凝土墩柱成型质量好,拆模后可以达到清水混凝土的效果,无须额外装饰,混凝土成型表面光洁、气泡少、色泽均匀、模板拼缝少。
Pier column fair-faced concrete construction method, pier column and steel formwork structure
The invention relates to the technical field of pier column construction, and provides a pier column fair-faced concrete construction method, a pier column and a steel formwork structure.The method comprises the following steps that formwork matching design is conducted firstly, a factory conducts production and trial splicing of the steel formwork structure on the basis of the formwork matching design, and the generated steel formwork structure is subjected to on-site splicing and formwork closing reinforcement; if the template is not qualified, returning to the previous step until the template passes the acceptance; and finally, concrete is poured, and film covering curing is conducted. The pier column pouring cavity is formed by folding the spliced steel formwork structures, and compared with a traditional wood formwork, the steel formwork structures are more in turnover frequency, and cost is saved. And common quality problems such as template splicing seams, slab staggering and deflection can be effectively eliminated. The forming quality of the concrete pier column is good, the effect of bare concrete can be achieved after form stripping, additional decoration is not needed, the concrete forming surface is smooth, bubbles are few, the color is uniform, and formwork abutted seams are few.
本申请涉及墩柱施工技术领域,提供了一种墩柱清水混凝土施工方法、墩柱及钢模板结构,方法包括以下步骤:先进行配模设计,工厂再基于配模设计,进行钢模板结构的生产、试拼,将生成的钢模板结构进行现场拼装、合模加固;再进行模板吊装和验收,若验收不合格,则返回上一步,直至验收通过;最后浇筑混凝土,进行覆膜养护。通过拼接的钢模板结构合拢形成墩柱浇筑腔,与传统木模板比较,钢模板结构的周转次数多,节约成本。可有效的消除模板拼缝、错台、偏斜等质量通病的发生。混凝土墩柱成型质量好,拆模后可以达到清水混凝土的效果,无须额外装饰,混凝土成型表面光洁、气泡少、色泽均匀、模板拼缝少。
Pier column fair-faced concrete construction method, pier column and steel formwork structure
一种墩柱清水混凝土施工方法、墩柱及钢模板结构
JIANG XIANGYANG (author) / XIANG HAIFENG (author) / WEN WEN (author) / XIE ZHIYONG (author) / LI WEI (author) / WANG RAN (author)
2024-07-30
Patent
Electronic Resource
Chinese
Pier stud fair-faced concrete construction method and pier stud
European Patent Office | 2020
|Set-shaped steel formwork for construction of concrete pier column structure and construction method
European Patent Office | 2020
|European Patent Office | 2023
|