A platform for research: civil engineering, architecture and urbanism
Aluminum alloy formwork and climbing frame shared screw hole construction method
The invention relates to an aluminum alloy formwork and climbing frame shared screw hole construction method and belongs to the field of building construction. The construction method specifically comprises the following steps of conducting detailed design on an aluminum alloy formwork and a climbing frame according to the construction requirements to solve the conflict problem of locating of holes of the aluminum alloy formwork and the climbing frame; coinciding an installation drawing of the aluminum alloy formwork and an installation drawing of the climbing frame, prepositioning through-wall screw holes in the design drawing, and conducting vacant site rechecking on the prefabricated aluminum alloy formwork; rechecking the size of aluminum alloy formwork double-ended screw internal braces and the size of through-wall screws, and arranging and installing PVC pipes and the aluminum alloy formwork; conducting modification, adjustment and elevation rechecking after installation of the aluminum alloy formwork, conducting attached reinforcement and acceptance check, pouring the concrete into the aluminum alloy formwork after qualified acceptance, dismantling the aluminum alloy formwork after concrete setting, and erecting the climbing frame according to construction requirements. Through the aluminum alloy formwork and climbing frame shared screw hole construction method, the climbing frame through-wall screw holes and aluminum alloy formwork fixing screw holes are shared, the component period is shortened, and the construction cost is reduced.
本发明涉及一种铝合金模板与爬架共用螺杆洞施工工法,属于建筑施工领域,具体包括以下步骤:根据施工需求,对铝合金模板、爬架进行深化设计,解决铝合金模板与爬架间的孔洞定位冲突问题;将铝合金模板的安装图纸和爬架的安装图纸重合,在设计的图纸上预先定位穿墙螺杆孔,根据对预拼装的铝合金模板进行空位复核;复核铝合金模板对拉螺杆内撑尺寸,穿墙螺杆尺寸,设置安装PVC管和铝合金模板;铝合金模板安装后进行修改调整及标高复核,再进行附着加固及检查验收,验收合格后进行铝合金模板内浇筑,混凝土凝固定型后拆除铝合金模板,可根据施工需求进行爬架搭设。本发明将爬架穿墙螺孔与铝合金模板固定螺孔进行共用,节省工期,降低施工成本。
Aluminum alloy formwork and climbing frame shared screw hole construction method
The invention relates to an aluminum alloy formwork and climbing frame shared screw hole construction method and belongs to the field of building construction. The construction method specifically comprises the following steps of conducting detailed design on an aluminum alloy formwork and a climbing frame according to the construction requirements to solve the conflict problem of locating of holes of the aluminum alloy formwork and the climbing frame; coinciding an installation drawing of the aluminum alloy formwork and an installation drawing of the climbing frame, prepositioning through-wall screw holes in the design drawing, and conducting vacant site rechecking on the prefabricated aluminum alloy formwork; rechecking the size of aluminum alloy formwork double-ended screw internal braces and the size of through-wall screws, and arranging and installing PVC pipes and the aluminum alloy formwork; conducting modification, adjustment and elevation rechecking after installation of the aluminum alloy formwork, conducting attached reinforcement and acceptance check, pouring the concrete into the aluminum alloy formwork after qualified acceptance, dismantling the aluminum alloy formwork after concrete setting, and erecting the climbing frame according to construction requirements. Through the aluminum alloy formwork and climbing frame shared screw hole construction method, the climbing frame through-wall screw holes and aluminum alloy formwork fixing screw holes are shared, the component period is shortened, and the construction cost is reduced.
本发明涉及一种铝合金模板与爬架共用螺杆洞施工工法,属于建筑施工领域,具体包括以下步骤:根据施工需求,对铝合金模板、爬架进行深化设计,解决铝合金模板与爬架间的孔洞定位冲突问题;将铝合金模板的安装图纸和爬架的安装图纸重合,在设计的图纸上预先定位穿墙螺杆孔,根据对预拼装的铝合金模板进行空位复核;复核铝合金模板对拉螺杆内撑尺寸,穿墙螺杆尺寸,设置安装PVC管和铝合金模板;铝合金模板安装后进行修改调整及标高复核,再进行附着加固及检查验收,验收合格后进行铝合金模板内浇筑,混凝土凝固定型后拆除铝合金模板,可根据施工需求进行爬架搭设。本发明将爬架穿墙螺孔与铝合金模板固定螺孔进行共用,节省工期,降低施工成本。
Aluminum alloy formwork and climbing frame shared screw hole construction method
一种铝合金模板与爬架共用螺杆洞施工工法
YUAN XIAOKUN (author) / YANG TAO (author) / KONG XIANGLIN (author)
2020-06-19
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Aluminum alloy formwork and climbing frame matched construction method
European Patent Office | 2023
|Aluminum alloy formwork and climbing frame matched construction method
European Patent Office | 2016
|Construction method for wall-attached connection of aluminum alloy formwork and climbing frame
European Patent Office | 2024
|Hydraulic climbing formwork and climbing formwork construction method
European Patent Office | 2021
|