Fabricated trolley for box culvert construction and construction method thereof
A fabricated trolley for box culvert construction is provided. Rails are longitudinally laid on a poured box culvert bottom plate, stand columns with walking wheels and stand columns with adjustable bottom supports A are arranged above the rails in a staggered mode, longitudinal beams are supported above the stand columns, a plurality of sets of bailey beams are erected above the longitudinal beams, and a top formwork is supported above the bailey beams; left and right ends of each bailey beam are connected with end trusses; the side faces of the stand columns are connected with side formworksthrough adjusting screws and jacks. The fabricated trolley is used for pouring a box culvert wall body and top plate concrete at the same time, the box culvert concrete pouring efficiency can be greatly improved, the inner surface and the outer surface of a poured box culvert are smooth, constructors can use the trolley conveniently, and all components of the trolley can be disassembled and installed quickly and are convenient to maintain.
箱涵施工用装配式台车,在已浇筑好的箱涵底板上纵向铺设轨道,轨道上方交错设置带行走轮的立柱和带可调底托A的立柱,立柱上方支撑纵梁,纵梁上方架设若干组贝雷梁,贝雷梁上方支撑顶模板;贝雷梁左右两端连接端头桁架;立柱的侧面通过调节螺杆和千斤顶连接侧模板。本发明用于箱涵的墙身与顶板混凝土同时浇筑,可大大提高箱涵混凝土浇筑的效率,所浇筑的箱涵内外表面平整,施工人员使用便捷,台车所有部件均可快速拆卸,快速安装,维护方便。
Fabricated trolley for box culvert construction and construction method thereof
A fabricated trolley for box culvert construction is provided. Rails are longitudinally laid on a poured box culvert bottom plate, stand columns with walking wheels and stand columns with adjustable bottom supports A are arranged above the rails in a staggered mode, longitudinal beams are supported above the stand columns, a plurality of sets of bailey beams are erected above the longitudinal beams, and a top formwork is supported above the bailey beams; left and right ends of each bailey beam are connected with end trusses; the side faces of the stand columns are connected with side formworksthrough adjusting screws and jacks. The fabricated trolley is used for pouring a box culvert wall body and top plate concrete at the same time, the box culvert concrete pouring efficiency can be greatly improved, the inner surface and the outer surface of a poured box culvert are smooth, constructors can use the trolley conveniently, and all components of the trolley can be disassembled and installed quickly and are convenient to maintain.
箱涵施工用装配式台车,在已浇筑好的箱涵底板上纵向铺设轨道,轨道上方交错设置带行走轮的立柱和带可调底托A的立柱,立柱上方支撑纵梁,纵梁上方架设若干组贝雷梁,贝雷梁上方支撑顶模板;贝雷梁左右两端连接端头桁架;立柱的侧面通过调节螺杆和千斤顶连接侧模板。本发明用于箱涵的墙身与顶板混凝土同时浇筑,可大大提高箱涵混凝土浇筑的效率,所浇筑的箱涵内外表面平整,施工人员使用便捷,台车所有部件均可快速拆卸,快速安装,维护方便。
Fabricated trolley for box culvert construction and construction method thereof
箱涵施工用装配式台车及其施工方法
ZHAO WU (author) / JIANG CHANGSHENG (author) / WEI QUAN (author) / ZHANG KUNQIU (author) / LUO GUANG (author) / YAO QINGYUN (author) / LI YULIN (author) / ZHOU ENXIAN (author) / MENG XUENING (author) / LIAO XIAOYANG (author)
2020-07-17
Patent
Electronic Resource
Chinese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E02D
FOUNDATIONS
,
Gründungen
Formwork trolley for water conservancy box culvert construction
European Patent Office | 2023
|Novel fabricated box culvert and construction method thereof
European Patent Office | 2020
|