Integral pouring construction method of stand column type pier
The invention discloses an integral pouring construction method of a stand column type pier. The method comprises the following steps: (1) mold assembling: more than two stand column molds are assembled on the ground; meanwhile, a tie beam mold is assembled between every two adjacent stand column molds, a support padstone mold is assembled at the top of each stand column mold, and a plurality of vibration receding holes are formed in the part, located in the periphery of the support padstone mold, of the top of each stand column mold; and (2) pouring forming: specifically, concrete is injectedinto the whole die from the top of each support padstone die, and finally construction is completed after the concrete is formed. The stand column molds, the tie beam mold and the support padstone mold are communicated with one another to form an integral mold, so that concrete can be injected into the stand column molds, the tie beam mold and the support padstone mold at a time, the working efficiency is effectively improved, the process time is shortened, the construction cost is reduced, application is wide, and the mold can be popularized and used.
本发明公开了一种立柱式桥墩的整体浇筑施工方法,包括以下步骤:(1)模具组装:在地面上组装出两个以上的立柱模具,同时在每相邻两个所述立柱模具之间分别组装出系梁模具,在各所述立柱模具的顶部分别组装出支座垫石模具,并在各所述立柱模具的顶部的位于所述支座垫石模具外围的部分上开设多个振捣让位孔洞;(2)浇筑成型:边从各所述支座垫石模具的顶部向所述模具整体内注入混凝土,最后待混凝土成型即完成施工。本发明将立柱模具与系梁模具和支座垫石模具相互贯通连成一个整体模具,这样可以一次性向立柱模具、系梁模具和支座垫石模具中注入混凝土,有效提升工作效率,缩短工序时间,减少施工成本,适用性广,可推广使用。
Integral pouring construction method of stand column type pier
The invention discloses an integral pouring construction method of a stand column type pier. The method comprises the following steps: (1) mold assembling: more than two stand column molds are assembled on the ground; meanwhile, a tie beam mold is assembled between every two adjacent stand column molds, a support padstone mold is assembled at the top of each stand column mold, and a plurality of vibration receding holes are formed in the part, located in the periphery of the support padstone mold, of the top of each stand column mold; and (2) pouring forming: specifically, concrete is injectedinto the whole die from the top of each support padstone die, and finally construction is completed after the concrete is formed. The stand column molds, the tie beam mold and the support padstone mold are communicated with one another to form an integral mold, so that concrete can be injected into the stand column molds, the tie beam mold and the support padstone mold at a time, the working efficiency is effectively improved, the process time is shortened, the construction cost is reduced, application is wide, and the mold can be popularized and used.
本发明公开了一种立柱式桥墩的整体浇筑施工方法,包括以下步骤:(1)模具组装:在地面上组装出两个以上的立柱模具,同时在每相邻两个所述立柱模具之间分别组装出系梁模具,在各所述立柱模具的顶部分别组装出支座垫石模具,并在各所述立柱模具的顶部的位于所述支座垫石模具外围的部分上开设多个振捣让位孔洞;(2)浇筑成型:边从各所述支座垫石模具的顶部向所述模具整体内注入混凝土,最后待混凝土成型即完成施工。本发明将立柱模具与系梁模具和支座垫石模具相互贯通连成一个整体模具,这样可以一次性向立柱模具、系梁模具和支座垫石模具中注入混凝土,有效提升工作效率,缩短工序时间,减少施工成本,适用性广,可推广使用。
Integral pouring construction method of stand column type pier
一种立柱式桥墩的整体浇筑施工方法
XU YONG (author) / ZHANG WANBIAO (author) / WANG JIE (author) / CHEN DAYONG (author) / NIAN BO (author) / LU JINGJING (author) / CHENG XU (author) / ZHAO PEIDONG (author) / ZHOU YANG (author) / ZHANG YIFEI (author)
2020-07-28
Patent
Electronic Resource
Chinese
Formwork system and method for high pier column pouring construction
European Patent Office | 2023
|Combined pier column of large building bridge and pouring method of combined pier column
European Patent Office | 2020
|Cover excavation method construction stand column concrete pouring device and pouring method
European Patent Office | 2022
|