A platform for research: civil engineering, architecture and urbanism
Formwork system and method for high pier column pouring construction
The invention belongs to the technical field of pier column construction, and particularly provides a formwork system and method for high pier column pouring construction. An inner mold of the formwork system comprises a plurality of cylindrical inner mold sections which are vertically and sequentially spliced; each inner mold section is provided with a plurality of inner mold plates in the circumferential direction of the barrel body, and the inner mold plates are detachably spliced; the outer mold comprises a plurality of cylindrical outer mold sections which are vertically and sequentially spliced; each outer mold section is provided with a plurality of outer mold plates in the circumferential direction of the barrel body, and the outer mold plates are detachably spliced; the inner mold is nested in an inner cavity of the outer mold, the outer mold and the inner mold are tensioned through a connecting piece, and a concrete pouring cavity is defined between the inner mold and the outer mold; the outer annular plate is formed by splicing a plurality of arc-shaped plates in the circumferential direction, and the outer annular plate can be fixed to the lower portion of an outer mold and fixed through a poured pier column. The inner annular plate is formed by splicing a plurality of arc-shaped plates in the circumferential direction, and the inner annular plate can be fixed to the lower portion of the inner mold and fixed through a poured pier column.
本申请属于墩柱施工技术领域,具体提供了一种高墩柱浇筑施工用模板系统及方法,其内模具包括竖向依次拼接的多个筒形的内模分段;每个内模分段沿筒体的周向具有多个内模板,多个内模板之间可拆卸拼接;外模具包括竖向依次拼接的多个筒形的外模分段;每个外模分段沿筒体的周向具有多个外模板,多个外模板之间可拆卸拼接;内模具嵌套设置于外模具的内腔,外模具与内模具之间通过连接件张拉,内模具与外模具之间围合形成混凝土的浇筑腔;外环形板沿周向由多个弧形板拼接组成,外环形板能够固定于外模具下方,并通过已经浇筑的墩柱固定;内环形板沿周向由多个弧形板拼接组成,内环形板能够固定于内模具下方,并通过已经浇筑的墩柱固定。
Formwork system and method for high pier column pouring construction
The invention belongs to the technical field of pier column construction, and particularly provides a formwork system and method for high pier column pouring construction. An inner mold of the formwork system comprises a plurality of cylindrical inner mold sections which are vertically and sequentially spliced; each inner mold section is provided with a plurality of inner mold plates in the circumferential direction of the barrel body, and the inner mold plates are detachably spliced; the outer mold comprises a plurality of cylindrical outer mold sections which are vertically and sequentially spliced; each outer mold section is provided with a plurality of outer mold plates in the circumferential direction of the barrel body, and the outer mold plates are detachably spliced; the inner mold is nested in an inner cavity of the outer mold, the outer mold and the inner mold are tensioned through a connecting piece, and a concrete pouring cavity is defined between the inner mold and the outer mold; the outer annular plate is formed by splicing a plurality of arc-shaped plates in the circumferential direction, and the outer annular plate can be fixed to the lower portion of an outer mold and fixed through a poured pier column. The inner annular plate is formed by splicing a plurality of arc-shaped plates in the circumferential direction, and the inner annular plate can be fixed to the lower portion of the inner mold and fixed through a poured pier column.
本申请属于墩柱施工技术领域,具体提供了一种高墩柱浇筑施工用模板系统及方法,其内模具包括竖向依次拼接的多个筒形的内模分段;每个内模分段沿筒体的周向具有多个内模板,多个内模板之间可拆卸拼接;外模具包括竖向依次拼接的多个筒形的外模分段;每个外模分段沿筒体的周向具有多个外模板,多个外模板之间可拆卸拼接;内模具嵌套设置于外模具的内腔,外模具与内模具之间通过连接件张拉,内模具与外模具之间围合形成混凝土的浇筑腔;外环形板沿周向由多个弧形板拼接组成,外环形板能够固定于外模具下方,并通过已经浇筑的墩柱固定;内环形板沿周向由多个弧形板拼接组成,内环形板能够固定于内模具下方,并通过已经浇筑的墩柱固定。
Formwork system and method for high pier column pouring construction
一种高墩柱浇筑施工用模板系统及方法
ZHANG FANGZHI (author) / ZHANG CHAO (author) / ZHANG WENLONG (author) / WANG XIAOCHAO (author) / CHENG GUANLIANG (author) / SONG JIN-JOO (author) / WANG ZHENGBO (author)
2023-05-12
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Formwork and construction method for bridge formwork turnover pier column construction
European Patent Office | 2023
|Bridge pier pouring steel formwork reinforcing structure for bridge construction
European Patent Office | 2023
|