Construction method of outer wall heat insulating layer
The invention relates to a construction method of an outer wall heat insulating layer. An outer wall where a heat insulating layer needs to be arranged is determined; the thickness of the heat insulating layer is determined; the height of an ash cake is determined based on the thickness of the heat insulating layer; the ash cake is manufactured on the inner surface of the outer wall according to the height of the ash cake; and after the ask cake is manufactured, heat insulating slurry is painted on the inner surface of the outer wall until the heat insulating layer is constructed, and an innerfilling wall with the heat insulating layer is obtained. The thickness of the needed heat insulating layer is determined, then the ash cake is manufactured based on the thickness of the heat insulating layer, the heat insulating slurry is used for painting, the inner filling wall with the heat insulating layer can be arranged in the outer wall, thus, the heat transfer coefficient of a heat bridgeportion can be reduced, and then a heat bridge effect is solved.
本发明涉及一种外墙保温层施工方法,确定需要设置保温层的外墙;确定所述保温层的厚度,基于所述保温层的厚度确定灰饼高度;按照所述灰饼高度在所述外墙的内表面制作灰饼;在灰饼制作完成后,使用保温浆料在所述外墙的内表面进行粉刷,直至所述保温层的施工完成,得到包含所述保温层的内部填充墙。通过确定所需的保温层厚度,然后基于保温层厚度制作灰饼,并使用保温浆料进行粉刷,可以在外墙内部设置包含保温层的内部填充墙,从而可以降低热桥部位的传热系数,进而解决热桥效应。
Construction method of outer wall heat insulating layer
The invention relates to a construction method of an outer wall heat insulating layer. An outer wall where a heat insulating layer needs to be arranged is determined; the thickness of the heat insulating layer is determined; the height of an ash cake is determined based on the thickness of the heat insulating layer; the ash cake is manufactured on the inner surface of the outer wall according to the height of the ash cake; and after the ask cake is manufactured, heat insulating slurry is painted on the inner surface of the outer wall until the heat insulating layer is constructed, and an innerfilling wall with the heat insulating layer is obtained. The thickness of the needed heat insulating layer is determined, then the ash cake is manufactured based on the thickness of the heat insulating layer, the heat insulating slurry is used for painting, the inner filling wall with the heat insulating layer can be arranged in the outer wall, thus, the heat transfer coefficient of a heat bridgeportion can be reduced, and then a heat bridge effect is solved.
本发明涉及一种外墙保温层施工方法,确定需要设置保温层的外墙;确定所述保温层的厚度,基于所述保温层的厚度确定灰饼高度;按照所述灰饼高度在所述外墙的内表面制作灰饼;在灰饼制作完成后,使用保温浆料在所述外墙的内表面进行粉刷,直至所述保温层的施工完成,得到包含所述保温层的内部填充墙。通过确定所需的保温层厚度,然后基于保温层厚度制作灰饼,并使用保温浆料进行粉刷,可以在外墙内部设置包含保温层的内部填充墙,从而可以降低热桥部位的传热系数,进而解决热桥效应。
Construction method of outer wall heat insulating layer
一种外墙保温层施工方法
XIE BINGLE (author)
2020-07-28
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Construction method for building outer wall insulating layer
European Patent Office | 2015
|Building construction process for heat-insulating outer wall
European Patent Office | 2023
|Construction process of anti-cracking heat-insulating layer of residence outer wall
European Patent Office | 2024
|