Building construction process for heat-insulating outer wall
The invention provides a thermal insulation outer wall building construction process, which is applied to the technical field of construction site construction, and is characterized by comprising the following steps: treating a foundation wall, and hanging a datum line; mixing a binding agent; using the adhesive to adhere the insulation board, and checking and correcting the insulation board; the adhesive is fully adhered to the surface, attached to the foundation wall, of the heat preservation plate, and the adhesive adhered to the side edge of the heat preservation plate is scraped off before adhesion; the rendering coat mortar is mixed; surface mortar is smeared, and gridding cloth is laid and pressed; anchor bolts are installed; after the gridding cloth is embedded into the rendering coat mortar, anchoring part construction is conducted immediately; the rendering coat mortar is smeared for the last time; a facing layer is constructed; the facing layer construction comprises facing brick facing and coating facing; the thermal insulation outer wall has the technical effects that the fixing stability and the sealing performance between the foundation wall and the thermal insulation layer are improved, so that the thermal insulation effect of the thermal insulation layer on the foundation wall layer is better, the thermal insulation layer and the foundation wall are fixed more firmly, the problem that the thermal insulation layer cracks and peels off is not prone to occurring, and the firmness of the thermal insulation outer wall is improved.
本发明提供一种保温外墙建筑施工工艺,应用在建筑工地施工技术领域,其技术方案要点是:包括以下步骤:处理基墙,挂基准线;拌制粘结剂;使用所述粘结剂粘贴保温板,并检查、修正保温板;所述保温板与基墙贴合的一面满粘所述粘结剂,粘贴前刮除沾到所述保温板侧边的粘结剂;拌制抹面胶浆;抹抹面胶浆,并铺压网格布;安装锚栓;网格布埋入抹面胶浆后,立即进行锚固件施工;抹最后一遍抹面胶浆;饰面层施工;饰面层施工包括面砖饰面和涂料饰面;具有的技术效果是:提高基墙与保温层之间的固定稳定性以及密封性,从而保温层对基墙层的保温效果更好,保温层与基墙之间固定更加牢固,不易出现保温层开裂剥落的问题,提高了保温外墙的坚固性。
Building construction process for heat-insulating outer wall
The invention provides a thermal insulation outer wall building construction process, which is applied to the technical field of construction site construction, and is characterized by comprising the following steps: treating a foundation wall, and hanging a datum line; mixing a binding agent; using the adhesive to adhere the insulation board, and checking and correcting the insulation board; the adhesive is fully adhered to the surface, attached to the foundation wall, of the heat preservation plate, and the adhesive adhered to the side edge of the heat preservation plate is scraped off before adhesion; the rendering coat mortar is mixed; surface mortar is smeared, and gridding cloth is laid and pressed; anchor bolts are installed; after the gridding cloth is embedded into the rendering coat mortar, anchoring part construction is conducted immediately; the rendering coat mortar is smeared for the last time; a facing layer is constructed; the facing layer construction comprises facing brick facing and coating facing; the thermal insulation outer wall has the technical effects that the fixing stability and the sealing performance between the foundation wall and the thermal insulation layer are improved, so that the thermal insulation effect of the thermal insulation layer on the foundation wall layer is better, the thermal insulation layer and the foundation wall are fixed more firmly, the problem that the thermal insulation layer cracks and peels off is not prone to occurring, and the firmness of the thermal insulation outer wall is improved.
本发明提供一种保温外墙建筑施工工艺,应用在建筑工地施工技术领域,其技术方案要点是:包括以下步骤:处理基墙,挂基准线;拌制粘结剂;使用所述粘结剂粘贴保温板,并检查、修正保温板;所述保温板与基墙贴合的一面满粘所述粘结剂,粘贴前刮除沾到所述保温板侧边的粘结剂;拌制抹面胶浆;抹抹面胶浆,并铺压网格布;安装锚栓;网格布埋入抹面胶浆后,立即进行锚固件施工;抹最后一遍抹面胶浆;饰面层施工;饰面层施工包括面砖饰面和涂料饰面;具有的技术效果是:提高基墙与保温层之间的固定稳定性以及密封性,从而保温层对基墙层的保温效果更好,保温层与基墙之间固定更加牢固,不易出现保温层开裂剥落的问题,提高了保温外墙的坚固性。
Building construction process for heat-insulating outer wall
一种保温外墙建筑施工工艺
CHEN XUPENG (author) / XU YING (author) / XI AIHUA (author) / LI RONGHUA (author)
2023-10-20
Patent
Electronic Resource
Chinese
Construction method for building outer wall insulating layer
European Patent Office | 2015
|Building outer wall energy-saving and heat-insulating structure and construction method
European Patent Office | 2024
|Waterproof, heat-insulating and energy-saving building outer wall
European Patent Office | 2023
|