Efficient interspersing flow construction method for high-rise building construction
The invention relates to the technical field of building construction, and discloses an efficient interspersing flow construction method for high-rise building construction. The method comprises the following steps that S1: designing and purchasing are conducted: specifically, a building drawing is designed, deep design on the design drawing is conducted, construction materials and construction process steps are subjected to detailed decomposition, a material list is generated for preparation of later centralized processing, and interspersing construction, and part of the materials purchased is in advance; S2, construction period checking is conducted: specifically, construction period checking on the construction process steps in the S1 step is conducted, and certain buffer time is reserved for each construction process step; S3, construction is conducted: specifically, the following steps are included: a1, a main body frame of N layers is constructed: a scaffold is mounted, reinforcing steel bars are bundled and a formwork is mounted. The efficient interspersing flow construction method for the high-rise building construction has the advantages that the construction period is accurately calculated, time of each construction link is uniform, the rhythm is unified, and the completion time is not influenced.
本发明涉及建筑施工技术领域,且公开了一种高层建筑建造用高效穿插流水施工方法,包括以下步骤;S1:设计和采购:设计建筑图纸,并且对设计图纸进行深化设计,将施工材料量化、施工工艺步骤详细分解,并生成材料清单,为后期的集中加工、穿插施工做准备,并对部分材料提前进行采购;S2:工期核算:对所述S1步骤中的施工工艺步骤进行工期核算,并且每一个施工工艺步骤均留有一定缓冲时间;S3:施工:具体包括以下步骤:a1:对N层进行主体框架进行施工:安装脚手架,钢筋捆扎,安装模板。该高层建筑建造用高效穿插流水施工方法,具备对工期进行精准推算,每一施工环节时间统一,节奏统一,不会影响完工时间等优点。
Efficient interspersing flow construction method for high-rise building construction
The invention relates to the technical field of building construction, and discloses an efficient interspersing flow construction method for high-rise building construction. The method comprises the following steps that S1: designing and purchasing are conducted: specifically, a building drawing is designed, deep design on the design drawing is conducted, construction materials and construction process steps are subjected to detailed decomposition, a material list is generated for preparation of later centralized processing, and interspersing construction, and part of the materials purchased is in advance; S2, construction period checking is conducted: specifically, construction period checking on the construction process steps in the S1 step is conducted, and certain buffer time is reserved for each construction process step; S3, construction is conducted: specifically, the following steps are included: a1, a main body frame of N layers is constructed: a scaffold is mounted, reinforcing steel bars are bundled and a formwork is mounted. The efficient interspersing flow construction method for the high-rise building construction has the advantages that the construction period is accurately calculated, time of each construction link is uniform, the rhythm is unified, and the completion time is not influenced.
本发明涉及建筑施工技术领域,且公开了一种高层建筑建造用高效穿插流水施工方法,包括以下步骤;S1:设计和采购:设计建筑图纸,并且对设计图纸进行深化设计,将施工材料量化、施工工艺步骤详细分解,并生成材料清单,为后期的集中加工、穿插施工做准备,并对部分材料提前进行采购;S2:工期核算:对所述S1步骤中的施工工艺步骤进行工期核算,并且每一个施工工艺步骤均留有一定缓冲时间;S3:施工:具体包括以下步骤:a1:对N层进行主体框架进行施工:安装脚手架,钢筋捆扎,安装模板。该高层建筑建造用高效穿插流水施工方法,具备对工期进行精准推算,每一施工环节时间统一,节奏统一,不会影响完工时间等优点。
Efficient interspersing flow construction method for high-rise building construction
一种高层建筑建造用高效穿插流水施工方法
ZHAN JING (author) / WU BIN (author) / DAI PENGFEI (author) / TAO YUWU (author) / LUO CHAOXING (author) / SHI CHAO (author) / GUI LIANSHENG (author) / TAO XINGXING (author) / LIU CHUN (author)
2020-08-07
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2022
|Rapid interpenetrating flow construction method for high-rise building
European Patent Office | 2024
|Continued construction high-rise building engineering reinforcement construction method
European Patent Office | 2020
|