A platform for research: civil engineering, architecture and urbanism
The invention discloses a protection structure for building internal core tube construction. The protection structure comprises a core tube body, a protection bottom plate is arranged on the outer surface of the core tube body, a through hole is formed in the front face of the protection bottom plate, the outer surface of the protection bottom plate is connected with the core tube body in a sleeving mode, a safety protection plate is arranged above the protection bottom plate, the bottom face of the safety protection plate is fixedly connected with the upper surface of the protection bottom plate, symmetrical hydraulic rods are arranged below the protection bottom plate, and the top end of each hydraulic rod is fixedly connected with the bottom face of the protection bottom plate. According to the protection structure for building internal core tube construction, the protection structure can effectively climb along with construction of the core tube body through cooperation of an upper connecting structure and a lower connecting structure of the protection bottom plate, and the problems that an existing protection structure cannot climb according to the construction height of a core tube, a large amount of manual is consumed for height lifting, and consequently the construction progress of the core tube is slow are solved.
本发明公开了一种建筑内部核心筒施工的防护结构,包括核心筒体,所述核心筒体的外表面设有防护底板,所述防护底板的正面开设有通孔,所述防护底板的外表面与核心筒体相套接,所述防护底板的上方设有安全防护板,所述安全防护板的底面与防护底板的上表面固定连接,所述防护底板的下方设有相对称的液压杆,每个所述液压杆的顶端均与防护底板的底面固定连接。该建筑内部核心筒施工的防护结构,利用防护底板上部连接结构和下部连接结构进行配合,能够有效的实现防护结构跟随核心筒体施工进行爬升,解决了现有的防护结构不能够根据核心筒的施工高度进行爬升,消耗大量人工提升高度,造成核心筒施工进度缓慢的问题。
The invention discloses a protection structure for building internal core tube construction. The protection structure comprises a core tube body, a protection bottom plate is arranged on the outer surface of the core tube body, a through hole is formed in the front face of the protection bottom plate, the outer surface of the protection bottom plate is connected with the core tube body in a sleeving mode, a safety protection plate is arranged above the protection bottom plate, the bottom face of the safety protection plate is fixedly connected with the upper surface of the protection bottom plate, symmetrical hydraulic rods are arranged below the protection bottom plate, and the top end of each hydraulic rod is fixedly connected with the bottom face of the protection bottom plate. According to the protection structure for building internal core tube construction, the protection structure can effectively climb along with construction of the core tube body through cooperation of an upper connecting structure and a lower connecting structure of the protection bottom plate, and the problems that an existing protection structure cannot climb according to the construction height of a core tube, a large amount of manual is consumed for height lifting, and consequently the construction progress of the core tube is slow are solved.
本发明公开了一种建筑内部核心筒施工的防护结构,包括核心筒体,所述核心筒体的外表面设有防护底板,所述防护底板的正面开设有通孔,所述防护底板的外表面与核心筒体相套接,所述防护底板的上方设有安全防护板,所述安全防护板的底面与防护底板的上表面固定连接,所述防护底板的下方设有相对称的液压杆,每个所述液压杆的顶端均与防护底板的底面固定连接。该建筑内部核心筒施工的防护结构,利用防护底板上部连接结构和下部连接结构进行配合,能够有效的实现防护结构跟随核心筒体施工进行爬升,解决了现有的防护结构不能够根据核心筒的施工高度进行爬升,消耗大量人工提升高度,造成核心筒施工进度缓慢的问题。
Tube well internal structure for building construction and construction equipment
European Patent Office | 2024
|Construction method of frame-core tube building structure
European Patent Office | 2024
|Braced frame-core tube building structure and construction method thereof
European Patent Office | 2021
|Construction method of core tube steel structure building for viewing
European Patent Office | 2023
|