The tube well internal structure for building construction comprises a tube well reserved opening, a water retaining wall is arranged on the periphery of the tube well reserved opening, the distance between the tube well reserved opening and the wall face of a tube well is 200 mm or above, a pair of reinforcing cross beams is arranged on the two portions of the bottom side of the tube well reserved opening, and the reinforcing cross beams are arranged on the two sides of the bottom side of the tube well reserved opening. The tube well reserved opening is a through groove of a rectangular structure. The invention relates to the technical field of building tube well construction, the tube well internal structure for building construction and the construction equipment adopt split type structural design, the construction equipment and the tube well internal structure adopt split type connection, the tube well internal structure adopts prefabricated production, the tube well internal structure is installed on site during pipeline butt joint, the structural precision is high, and installation is convenient; and meanwhile, the tube well construction equipment can assist in completing installation of a tube well structure and pipeline butt joint, and the installation efficiency and precision are improved.
本发明公开了一种建筑施工用管井内部结构及施工设备,包括管井预留口,所述管井预留口的外围设置有挡水墙,所述管井预留口距离管井的墙面在200mm以上,所述管井预留口的底侧两部设置有一对加强横梁,所述管井预留口为矩形结构的通槽;本发明涉及建筑管井施工技术领域,该建筑施工用管井内部结构及施工设备,采用分体式结构设计,施工设备与管井内部结构采用分体连接,管井内部结构采用预制生产,在管道对接时现场进行安装,结构精度高且安装方便,同时管井施工设备可以辅助完成管井结构的安装以及管道对接,提高安装效率和精度。
The tube well internal structure for building construction comprises a tube well reserved opening, a water retaining wall is arranged on the periphery of the tube well reserved opening, the distance between the tube well reserved opening and the wall face of a tube well is 200 mm or above, a pair of reinforcing cross beams is arranged on the two portions of the bottom side of the tube well reserved opening, and the reinforcing cross beams are arranged on the two sides of the bottom side of the tube well reserved opening. The tube well reserved opening is a through groove of a rectangular structure. The invention relates to the technical field of building tube well construction, the tube well internal structure for building construction and the construction equipment adopt split type structural design, the construction equipment and the tube well internal structure adopt split type connection, the tube well internal structure adopts prefabricated production, the tube well internal structure is installed on site during pipeline butt joint, the structural precision is high, and installation is convenient; and meanwhile, the tube well construction equipment can assist in completing installation of a tube well structure and pipeline butt joint, and the installation efficiency and precision are improved.
本发明公开了一种建筑施工用管井内部结构及施工设备,包括管井预留口,所述管井预留口的外围设置有挡水墙,所述管井预留口距离管井的墙面在200mm以上,所述管井预留口的底侧两部设置有一对加强横梁,所述管井预留口为矩形结构的通槽;本发明涉及建筑管井施工技术领域,该建筑施工用管井内部结构及施工设备,采用分体式结构设计,施工设备与管井内部结构采用分体连接,管井内部结构采用预制生产,在管道对接时现场进行安装,结构精度高且安装方便,同时管井施工设备可以辅助完成管井结构的安装以及管道对接,提高安装效率和精度。
Tube well internal structure for building construction and construction equipment
一种建筑施工用管井内部结构及施工设备
MA KUN (author)
2024-10-29
Patent
Electronic Resource
Chinese