Construction process of secondary ceiling of integrated floor system
The invention discloses a construction process of a secondary ceiling of an integrated floor system. An original integrated floor system is included, an internal keel is arranged in the original integrated floor system, an expansion screw and a fixed bolt are correspondingly installed in the internal keel, the expansion screw is located on one side of the fixed bolt, an integrated floor system fireproof layer is arranged on the outer surface of the lower end of the internal keel, a gypsum board ceiling main body is arranged on the outer surface of the lower end of the integrated floor system fireproof layer, a secondary keel is arranged on the inner surface of the gypsum board ceiling main body, and the outer surface of the secondary keel is wrapped with double strands of galvanized steelwires. The invention aims to provide an installation method for quickly installing a secondary ceiling of a steel structure fabricated building, a special suspender of the ceiling is directly fixed tothe keel of the integrated floor system, the stability is ensured, the overall construction period of the decoration project is shortened, and the construction process has the technical effects thatthe construction period is greatly shortened, the operation difficulty of the site construction is reduced, and the overall firmness of the ceiling is improved.
本发明公开了一种集成楼盖二次吊顶的施工工艺,包括原集成楼盖,所述原集成楼盖的内部设置有内龙骨,且内龙骨的内部分别安装有膨胀螺丝与固定螺栓,所述膨胀螺丝位于固定螺栓的一侧,所述内龙骨的下端外表面设置有集成楼盖防火层,且集成楼盖防火层的下端外表面设置有石膏板吊顶主体,所述石膏板吊顶主体的内表面设置有次龙骨,且次龙骨外表面包裹有双股镀锌钢丝,本发明的目的是提供一种钢结构装配式建筑的快速安装二次吊顶的安装方式,采用吊顶专业吊杆直接固定于集成楼盖的龙骨上,保证了稳定性缩短了装修项目的整体工期本发明的技术效果为大大缩短了施工的工期,减少了现场施工的作业难度,提高了吊顶的整体牢固性。
Construction process of secondary ceiling of integrated floor system
The invention discloses a construction process of a secondary ceiling of an integrated floor system. An original integrated floor system is included, an internal keel is arranged in the original integrated floor system, an expansion screw and a fixed bolt are correspondingly installed in the internal keel, the expansion screw is located on one side of the fixed bolt, an integrated floor system fireproof layer is arranged on the outer surface of the lower end of the internal keel, a gypsum board ceiling main body is arranged on the outer surface of the lower end of the integrated floor system fireproof layer, a secondary keel is arranged on the inner surface of the gypsum board ceiling main body, and the outer surface of the secondary keel is wrapped with double strands of galvanized steelwires. The invention aims to provide an installation method for quickly installing a secondary ceiling of a steel structure fabricated building, a special suspender of the ceiling is directly fixed tothe keel of the integrated floor system, the stability is ensured, the overall construction period of the decoration project is shortened, and the construction process has the technical effects thatthe construction period is greatly shortened, the operation difficulty of the site construction is reduced, and the overall firmness of the ceiling is improved.
本发明公开了一种集成楼盖二次吊顶的施工工艺,包括原集成楼盖,所述原集成楼盖的内部设置有内龙骨,且内龙骨的内部分别安装有膨胀螺丝与固定螺栓,所述膨胀螺丝位于固定螺栓的一侧,所述内龙骨的下端外表面设置有集成楼盖防火层,且集成楼盖防火层的下端外表面设置有石膏板吊顶主体,所述石膏板吊顶主体的内表面设置有次龙骨,且次龙骨外表面包裹有双股镀锌钢丝,本发明的目的是提供一种钢结构装配式建筑的快速安装二次吊顶的安装方式,采用吊顶专业吊杆直接固定于集成楼盖的龙骨上,保证了稳定性缩短了装修项目的整体工期本发明的技术效果为大大缩短了施工的工期,减少了现场施工的作业难度,提高了吊顶的整体牢固性。
Construction process of secondary ceiling of integrated floor system
一种集成楼盖二次吊顶的施工工艺
WANG JING (author) / SUN WEI (author) / XIAO CHANGGENG (author) / WU SIYANG (author)
2020-08-11
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Composite floor-ceiling construction
Engineering Index Backfile | 1965
|CEILING INTEGRAL FLOOR PANEL STRUCTURE AND CONSTRUCTION METHOD OF CEILING INTEGRAL FLOOR PANEL
European Patent Office | 2023
|Manufacturing method of ceiling keel in integrated floor system
European Patent Office | 2020
|