A platform for research: civil engineering, architecture and urbanism
The invention discloses a ceiling joist structure. The ceiling joist structure comprises top joists, side joists, vertical joists, transverse joists and corner joists; first mounting holes are formedin the top faces of the top joists, the vertical joists are connected with the lower portions of the top joists, vertical reinforcing ribs and second vertical connecting hole sets are arranged on thevertical joists, the transverse joists are connected with the bottom ends of the vertical joists, and two ends of the transverse joists are correspondingly and vertically connected with the side joists and the corner joists. According to the ceiling joist structure, the construction method that the top joists are separately assembled with the side joists, the vertical joists, the transverse joistsand the corner joists is adopted, the mounting difficulty of the ceiling joists is reduced, construction is facilitated, meanwhile, the mounting positions of the side joists are aligned, the mountingsmoothness is guaranteed, and the first vertical connecting hole set and the second vertical connecting hole set are matched with each other so that flexible adjustment of the height and the width ofthe joist frame can be achieved; and a plurality of round holes or long round holes for adjusting the width can be formed in the bottom faces, connected with the transverse joists, of the corner joists and the side joists, and therefore the width of the joist frame is convenient to adjust.
本发明公开了吊顶龙骨结构,包括顶龙骨、边龙骨、竖龙骨、横龙骨和角龙骨,所述顶龙骨的顶面设置有第一安装孔,所述顶龙骨的下方连接有竖龙骨,竖龙骨上设置有竖向加强筋和第二竖向连接孔组,竖龙骨底端连接有横龙骨,横龙骨的两端分别垂直连接有边龙骨和角龙骨。本发明采用顶龙骨与边龙骨、竖龙骨、横龙骨、角龙骨之间分开装配的施工方法,减小了吊顶龙骨的安装难度,便于施工,同时对边龙骨的安装位置进行对准,保证了安装的平整型,而且第一竖向连接孔组和第二竖向连接孔组相互配合,可以实现对龙骨框架的高度和宽度的灵活调节,在角龙骨和边龙骨与横向龙骨连接的底面上也可以开设多个调节宽度的圆孔或长圆孔,便于调节龙骨框架的宽度。
The invention discloses a ceiling joist structure. The ceiling joist structure comprises top joists, side joists, vertical joists, transverse joists and corner joists; first mounting holes are formedin the top faces of the top joists, the vertical joists are connected with the lower portions of the top joists, vertical reinforcing ribs and second vertical connecting hole sets are arranged on thevertical joists, the transverse joists are connected with the bottom ends of the vertical joists, and two ends of the transverse joists are correspondingly and vertically connected with the side joists and the corner joists. According to the ceiling joist structure, the construction method that the top joists are separately assembled with the side joists, the vertical joists, the transverse joistsand the corner joists is adopted, the mounting difficulty of the ceiling joists is reduced, construction is facilitated, meanwhile, the mounting positions of the side joists are aligned, the mountingsmoothness is guaranteed, and the first vertical connecting hole set and the second vertical connecting hole set are matched with each other so that flexible adjustment of the height and the width ofthe joist frame can be achieved; and a plurality of round holes or long round holes for adjusting the width can be formed in the bottom faces, connected with the transverse joists, of the corner joists and the side joists, and therefore the width of the joist frame is convenient to adjust.
本发明公开了吊顶龙骨结构,包括顶龙骨、边龙骨、竖龙骨、横龙骨和角龙骨,所述顶龙骨的顶面设置有第一安装孔,所述顶龙骨的下方连接有竖龙骨,竖龙骨上设置有竖向加强筋和第二竖向连接孔组,竖龙骨底端连接有横龙骨,横龙骨的两端分别垂直连接有边龙骨和角龙骨。本发明采用顶龙骨与边龙骨、竖龙骨、横龙骨、角龙骨之间分开装配的施工方法,减小了吊顶龙骨的安装难度,便于施工,同时对边龙骨的安装位置进行对准,保证了安装的平整型,而且第一竖向连接孔组和第二竖向连接孔组相互配合,可以实现对龙骨框架的高度和宽度的灵活调节,在角龙骨和边龙骨与横向龙骨连接的底面上也可以开设多个调节宽度的圆孔或长圆孔,便于调节龙骨框架的宽度。
Ceiling joist structure and construction method
一种吊顶龙骨结构及施工方法
LIU FEI (author)
2020-08-11
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
MOUNTING STRUCTURE OF CEILING JOIST, AND CEILING JOIST MOUNTING METAL FITTING
European Patent Office | 2020
|CEILING JOIST INSTALLATION METAL FITTING, AND SEISMIC REINFORCEMENT STRUCTURE FOR CEILING JOIST
European Patent Office | 2017
|European Patent Office | 2018
|