Waterproof construction process for basement
The invention discloses a waterproof construction process for a basement, and relates to the field of building construction. The waterproof construction process for the basement comprises the following steps of S1, cleaning a base layer; S2, performing corner treatment; S3, conducting primer coating; S4, trial laying of a coiled material; S5, heating the surface of the coiled material; S6, pavingand pasting the coiled material; S7, scraping and sealing an interface; S8, pasting lap seams; and S9, constructing a protective layer. The waterproof construction process for the basement has the following advantages that cement mortar is made into a circular arc or a 135-degree break angle at the corner position, so that the waterproof coiled material can be flatly attached to the surface of thebase layer, the phenomena of hollowing and wrinkling are avoided, perfect sealing of all positions is achieved, and the waterproof effect of the whole basement is improved.
本发明公开了一种地下室防水施工工艺,涉及建筑施工领域,其包括如下步骤:S1,基层清理;S2,拐角处理;S3,底胶涂布;S4,卷材试铺;S5,加热卷材表面;S6,卷材铺贴;S7,刮封接口;S8,粘贴搭接缝;S9,保护层施工。本发明具有以下优点和效果:通过利用水泥砂浆在拐角位置做成圆弧形或135°的折角,使防水卷材可以平整的贴附在基层表面,避免出现空鼓、皱折现象,从而实现各个位置的完美密封,提高整个地下室的防水效果。
Waterproof construction process for basement
The invention discloses a waterproof construction process for a basement, and relates to the field of building construction. The waterproof construction process for the basement comprises the following steps of S1, cleaning a base layer; S2, performing corner treatment; S3, conducting primer coating; S4, trial laying of a coiled material; S5, heating the surface of the coiled material; S6, pavingand pasting the coiled material; S7, scraping and sealing an interface; S8, pasting lap seams; and S9, constructing a protective layer. The waterproof construction process for the basement has the following advantages that cement mortar is made into a circular arc or a 135-degree break angle at the corner position, so that the waterproof coiled material can be flatly attached to the surface of thebase layer, the phenomena of hollowing and wrinkling are avoided, perfect sealing of all positions is achieved, and the waterproof effect of the whole basement is improved.
本发明公开了一种地下室防水施工工艺,涉及建筑施工领域,其包括如下步骤:S1,基层清理;S2,拐角处理;S3,底胶涂布;S4,卷材试铺;S5,加热卷材表面;S6,卷材铺贴;S7,刮封接口;S8,粘贴搭接缝;S9,保护层施工。本发明具有以下优点和效果:通过利用水泥砂浆在拐角位置做成圆弧形或135°的折角,使防水卷材可以平整的贴附在基层表面,避免出现空鼓、皱折现象,从而实现各个位置的完美密封,提高整个地下室的防水效果。
Waterproof construction process for basement
一种地下室防水施工工艺
YING YAPING (author) / YING YANYAN (author) / YING XIAOMING (author) / LIN SHENGLI (author) / YU WEIMING (author) / WANG HAIXIA (author)
2020-08-14
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen