A platform for research: civil engineering, architecture and urbanism
Rapid construction method of prefabricated segmental beam
The invention discloses a rapid construction method of a prefabricated segmental beam, and aims to solve the technical problems of a prefabricated segmental assembled bracket system with the height of8m or unbalanced load and a bracket body supporting technology in the construction of a ramp bridge with a smaller radius. The rapid construction method of the prefabricated segmental beam comprisesthe following steps that after a foundation is treated, performing measurement and positioning; arranging a disc buckle support; laying main ridges and secondary ridges, and placing jacks; carrying out a preloading test on the stent system; performing primary settlement observation on the prefabricated segmental beams before and after suspension splicing; after settlement stabilization, performingpermanent prestress strand pulling, tensioning and pressure drop of the top plate are conducted according to design; completing permanent prestress construction of the roof; after tensioning of the prestressed steel strands is completed and grouting is conducted for 48 hours, detaching the support; and completing. The construction method is large in bearing capacity, reasonable in layout, safe and reliable; assembling and disassembling are convenient, the turnover capacity is high, and work efficiency is high; the steel consumption is reduced, and the cost is reduced.
本发明公开了一种预制节段梁的快速施工方法,旨在解决高度8m内或存在不均衡荷的预制节段拼装支架体系、半径较小的匝道桥的施工中的架体支撑技术存在的技术问题。本发明预制节段梁的快速施工方法包括以下步骤:地基处理后,测量定位;搭设盘扣支架;铺设主楞、次楞、放置千斤顶;对支架体系进行预压试验;预制节段梁在悬拼前后进行一次沉降观测;沉降稳定后根据设计进行顶板永久预应力穿束、张拉、压降;完成顶板永久预应力施工;在预应力钢绞线张拉完成后并灌浆48小时后拆除支架;即成。本发明的施工方法承载力大,布局合理、安全可靠;搭拆方便,周转能力强,工作效率高;节约用钢量,缩短成本。
Rapid construction method of prefabricated segmental beam
The invention discloses a rapid construction method of a prefabricated segmental beam, and aims to solve the technical problems of a prefabricated segmental assembled bracket system with the height of8m or unbalanced load and a bracket body supporting technology in the construction of a ramp bridge with a smaller radius. The rapid construction method of the prefabricated segmental beam comprisesthe following steps that after a foundation is treated, performing measurement and positioning; arranging a disc buckle support; laying main ridges and secondary ridges, and placing jacks; carrying out a preloading test on the stent system; performing primary settlement observation on the prefabricated segmental beams before and after suspension splicing; after settlement stabilization, performingpermanent prestress strand pulling, tensioning and pressure drop of the top plate are conducted according to design; completing permanent prestress construction of the roof; after tensioning of the prestressed steel strands is completed and grouting is conducted for 48 hours, detaching the support; and completing. The construction method is large in bearing capacity, reasonable in layout, safe and reliable; assembling and disassembling are convenient, the turnover capacity is high, and work efficiency is high; the steel consumption is reduced, and the cost is reduced.
本发明公开了一种预制节段梁的快速施工方法,旨在解决高度8m内或存在不均衡荷的预制节段拼装支架体系、半径较小的匝道桥的施工中的架体支撑技术存在的技术问题。本发明预制节段梁的快速施工方法包括以下步骤:地基处理后,测量定位;搭设盘扣支架;铺设主楞、次楞、放置千斤顶;对支架体系进行预压试验;预制节段梁在悬拼前后进行一次沉降观测;沉降稳定后根据设计进行顶板永久预应力穿束、张拉、压降;完成顶板永久预应力施工;在预应力钢绞线张拉完成后并灌浆48小时后拆除支架;即成。本发明的施工方法承载力大,布局合理、安全可靠;搭拆方便,周转能力强,工作效率高;节约用钢量,缩短成本。
Rapid construction method of prefabricated segmental beam
预制节段梁的快速施工方法
WANG ZENG'EN (author) / XIE JIYI (author) / ZHANG BANG (author) / WANG QIANQIAN (author) / ZHENG XINMING (author) / LIU SHUZHI (author) / HUANG SHILONG (author) / WANG XI (author) / GONG MINGXIA (author) / XING LE (author)
2020-08-18
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Construction method for assembled prefabricated segmental beam
European Patent Office | 2020
|High-precision construction method for cantilever prefabricated segmental beam
European Patent Office | 2021
|Construction method for prefabricated segmental beam construction under complex working conditions
European Patent Office | 2023
|On-beam beam transporting construction method suitable for segmental prefabricated assembled bridge
European Patent Office | 2023
|Segmental prefabricated assembled steel-concrete composite beam and construction method thereof
European Patent Office | 2023
|