Assembling method for double-rubber-ring steel bell and spigot reinforcement cage
The invention discloses an assembling method for a double-rubber-ring steel bell and spigot reinforcement cage. The method comprises the steps that an annular bottom mold and a plurality of limiting columns are installed coaxially, and the bottom mold and the limiting columns are fixed; a spigot steel ring is axially fixed to the bottom mold upwards; an inner reinforcement cage is arranged outsidethe limiting columns in a sleeving mode to be lowered until the lower end of the inner reinforcement cage is inserted into the spigot steel ring, and then welding is carried out; an annular top moldis arranged on the upper portions of the plurality of limiting columns in a sleeving mode, so that the top mold and the bottom mold are kept concentric, and then the top mold is fixed; a bell steel ring is hoisted above the inner reinforcement cage, the bell steel ring is lowered to the outer side of the top of the inner reinforcement cage in a sleeving mode, and the bell steel ring and the innerreinforcement cage are welded; and an outer reinforcement cage is hoisted to the position above the inner reinforcement cage, the outer reinforcement cage is arranged outside the inner reinforcement cage in a sleeving mode and lowered, the lower end of the outer reinforcement cage abuts against the bottom mold, and the two ends of the inner reinforcement cage are fixedly connected with the two ends of the outer reinforcement cage, so that the assembly of the reinforcement cage is completed. The assembling method improves the concentricity between each assembly of the reinforcement cage.
本发明公开了一种双胶圈钢承插口钢筋笼组装方法,环形的底模与多根限位柱进行同轴安装,并将底模和限位柱进行固定;将插口钢圈轴向朝上固定在底模上;内钢筋笼套在限位柱外部进行下放,至内钢筋笼下端插入插口钢圈内,然后进行焊接;将环形的顶模套设在多个限位柱的上部,使顶模与底模保持同轴心,然后将顶模进行固定;将承口钢圈吊装至内钢筋笼上方,承口钢圈下放至套在内钢筋笼顶部外侧,承口钢圈与内钢筋笼进行焊接;将外钢筋笼吊装至内钢筋笼上方,外钢筋笼套在内钢筋笼外部并下放,外钢筋笼下端抵触到底模上,内钢筋笼与外钢筋笼的两端连接固定,完成钢筋笼的组装。本发明的组装方法提高了钢筋笼各组件之间的同心度。
Assembling method for double-rubber-ring steel bell and spigot reinforcement cage
The invention discloses an assembling method for a double-rubber-ring steel bell and spigot reinforcement cage. The method comprises the steps that an annular bottom mold and a plurality of limiting columns are installed coaxially, and the bottom mold and the limiting columns are fixed; a spigot steel ring is axially fixed to the bottom mold upwards; an inner reinforcement cage is arranged outsidethe limiting columns in a sleeving mode to be lowered until the lower end of the inner reinforcement cage is inserted into the spigot steel ring, and then welding is carried out; an annular top moldis arranged on the upper portions of the plurality of limiting columns in a sleeving mode, so that the top mold and the bottom mold are kept concentric, and then the top mold is fixed; a bell steel ring is hoisted above the inner reinforcement cage, the bell steel ring is lowered to the outer side of the top of the inner reinforcement cage in a sleeving mode, and the bell steel ring and the innerreinforcement cage are welded; and an outer reinforcement cage is hoisted to the position above the inner reinforcement cage, the outer reinforcement cage is arranged outside the inner reinforcement cage in a sleeving mode and lowered, the lower end of the outer reinforcement cage abuts against the bottom mold, and the two ends of the inner reinforcement cage are fixedly connected with the two ends of the outer reinforcement cage, so that the assembly of the reinforcement cage is completed. The assembling method improves the concentricity between each assembly of the reinforcement cage.
本发明公开了一种双胶圈钢承插口钢筋笼组装方法,环形的底模与多根限位柱进行同轴安装,并将底模和限位柱进行固定;将插口钢圈轴向朝上固定在底模上;内钢筋笼套在限位柱外部进行下放,至内钢筋笼下端插入插口钢圈内,然后进行焊接;将环形的顶模套设在多个限位柱的上部,使顶模与底模保持同轴心,然后将顶模进行固定;将承口钢圈吊装至内钢筋笼上方,承口钢圈下放至套在内钢筋笼顶部外侧,承口钢圈与内钢筋笼进行焊接;将外钢筋笼吊装至内钢筋笼上方,外钢筋笼套在内钢筋笼外部并下放,外钢筋笼下端抵触到底模上,内钢筋笼与外钢筋笼的两端连接固定,完成钢筋笼的组装。本发明的组装方法提高了钢筋笼各组件之间的同心度。
Assembling method for double-rubber-ring steel bell and spigot reinforcement cage
一种双胶圈钢承插口钢筋笼组装方法
ZHAO CHUNLEI (author) / ZHAO YANHUI (author)
2020-09-15
Patent
Electronic Resource
Chinese
IPC:
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
Steel Trunk Lines with Bell and Spigot Joints
Wiley | 1930
|REINFORCEMENT CAGE ASSEMBLING DEVICE AND REINFORCEMENT CAGE ASSEMBLING METHOD
European Patent Office | 2023
|Socket and spigot joint module assembling type circular double-wall steel cofferdam
European Patent Office | 2021
|