A platform for research: civil engineering, architecture and urbanism
Method for removing suspended measure material
The invention provides a method for removing a suspended measure material, and belongs to the technical field of building structural members. The method comprises the following steps that 1, the measure material is integrally moved downwards by a certain distance in a building so as to form a removal space above the measure material; 2, in the removal space, the measure material is removed from the above position, and the removed measure material is removed out of the exterior of the building step by step; and 3, the measure material moved out of the building is hoisted to the ground. The method for removing the suspended measure material is used for removing the measure material inside the building, and after whole lifting of the building is completed, if the interior of the building is in a closed state, a measure structure added for whole lifting can be conveniently removed, a removal process is simple and rapid, and the requirement for equipment is low, so that the construction cost is reduced.
本发明提供的悬空措施材料拆除方法,属于建筑物结构构件技术领域,包括:步骤一,在建筑物的内部,将措施材料进行整体下移一段距离,从而在措施材料的上方形成拆解空间;步骤二,在所述拆解空间内,将所述措施材料从上方进行拆除,并将拆除的措施材料逐步移出至建筑物的外部;步骤三,将移出所述建筑物外的措施材料吊运至地面;本发明的悬空措施材料拆除方法,用于对建筑物内部的措施材料进行拆除,在建筑物进行整体提升完成之后,如果建筑物的内部为封闭状态,可较为便捷的对为了整体提升而增加的措施结构进行拆除,其拆除过程简单快速,对设备要求较低,从而降低施工成本。
Method for removing suspended measure material
The invention provides a method for removing a suspended measure material, and belongs to the technical field of building structural members. The method comprises the following steps that 1, the measure material is integrally moved downwards by a certain distance in a building so as to form a removal space above the measure material; 2, in the removal space, the measure material is removed from the above position, and the removed measure material is removed out of the exterior of the building step by step; and 3, the measure material moved out of the building is hoisted to the ground. The method for removing the suspended measure material is used for removing the measure material inside the building, and after whole lifting of the building is completed, if the interior of the building is in a closed state, a measure structure added for whole lifting can be conveniently removed, a removal process is simple and rapid, and the requirement for equipment is low, so that the construction cost is reduced.
本发明提供的悬空措施材料拆除方法,属于建筑物结构构件技术领域,包括:步骤一,在建筑物的内部,将措施材料进行整体下移一段距离,从而在措施材料的上方形成拆解空间;步骤二,在所述拆解空间内,将所述措施材料从上方进行拆除,并将拆除的措施材料逐步移出至建筑物的外部;步骤三,将移出所述建筑物外的措施材料吊运至地面;本发明的悬空措施材料拆除方法,用于对建筑物内部的措施材料进行拆除,在建筑物进行整体提升完成之后,如果建筑物的内部为封闭状态,可较为便捷的对为了整体提升而增加的措施结构进行拆除,其拆除过程简单快速,对设备要求较低,从而降低施工成本。
Method for removing suspended measure material
悬空措施材料拆除方法
CHEN ZHENMING (author) / CHENG YIKUN (author) / ZHANG YAOLIN (author) / KANG NING (author) / PENG CHAO (author) / WANG CONG (author) / WANG XIAO (author) / SUN YU (author)
2020-09-18
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Device and method for removing suspended-material particles
European Patent Office | 2016
|METHOD FOR CONSTRUCTING SUSPENDED SCAFFOLD, AND METHOD FOR REMOVING SUSPENDED SCAFFOLD
European Patent Office | 2023
|Mobile aquatic water surface suspended matter removing device
European Patent Office | 2022
|Screen apparatus for removing contaminants and suspended solids
European Patent Office | 2020
|