Civil construction method for ground foundation and pile foundation of high-rise building
The invention discloses a civil construction method for a ground foundation and a pile foundation of a high-rise building, and belongs to the technical field of building construction. The method comprises the following steps: selecting a target soil body to replace a soil body in the original ground foundation; adopting the processes of vibrating compaction and mechanical grinding for the ground foundation; draining water in soil layers of the ground foundation through a drainage consolidation construction technology; mutually bonding the soil layers in the ground foundation by virtue of mechanical substances, and then stirring the soil layers by virtue of mechanical equipment; determining pile positions, determining a surveying setting-out position by virtue of a steel rule and a theodolite, and in combination with construction drawings, and marking by virtue of wood piles; stacking tube piles by virtue of a pile hoisting technology, and in combination with a construction sequence andthe length of the tube piles, and arranging bolster layers between the ground and tube piles; and drilling in a pile foundation hole-forming manner, and arranging the pile foundation. According to the civil construction method for the ground foundation and the pile foundation of the high-rise building, through treatment for the ground foundation and the pile foundation, the strength of the groundfoundation is increased, and the stability and the bearing capacity of the building are improved; and moreover, the earthquake resistance of the building can further be improved, and the quality of integral construction is guaranteed.
本发明公开了一种高层建筑地基基础和桩基础的土建施工方法,属于建筑施工技术领域。所述方法包括:选择目标土体代替原有地基中的土体;对地基采取振动夯实和机械碾压工艺;采用排水固结施工技术将地基土层中的水分排出;利用化学物质,使地基中的土层相互粘结,然后利用机械设备搅和土层;确定桩位,结合施工图纸利用钢尺和经纬仪确定测放位置,并且利用木桩做好标记;利用吊运桩技术,结合施工顺序和管桩长度堆放管桩,将垫木层摆设在地面和管桩之间;利用桩基础成孔方式打孔,设置桩基础。本发明通过对地基基础和桩基础进行处理,提高了地基强度,提升了建筑的稳定性和承载力,且还可以提高建筑的抗震性,保障了整体施工的质量。
Civil construction method for ground foundation and pile foundation of high-rise building
The invention discloses a civil construction method for a ground foundation and a pile foundation of a high-rise building, and belongs to the technical field of building construction. The method comprises the following steps: selecting a target soil body to replace a soil body in the original ground foundation; adopting the processes of vibrating compaction and mechanical grinding for the ground foundation; draining water in soil layers of the ground foundation through a drainage consolidation construction technology; mutually bonding the soil layers in the ground foundation by virtue of mechanical substances, and then stirring the soil layers by virtue of mechanical equipment; determining pile positions, determining a surveying setting-out position by virtue of a steel rule and a theodolite, and in combination with construction drawings, and marking by virtue of wood piles; stacking tube piles by virtue of a pile hoisting technology, and in combination with a construction sequence andthe length of the tube piles, and arranging bolster layers between the ground and tube piles; and drilling in a pile foundation hole-forming manner, and arranging the pile foundation. According to the civil construction method for the ground foundation and the pile foundation of the high-rise building, through treatment for the ground foundation and the pile foundation, the strength of the groundfoundation is increased, and the stability and the bearing capacity of the building are improved; and moreover, the earthquake resistance of the building can further be improved, and the quality of integral construction is guaranteed.
本发明公开了一种高层建筑地基基础和桩基础的土建施工方法,属于建筑施工技术领域。所述方法包括:选择目标土体代替原有地基中的土体;对地基采取振动夯实和机械碾压工艺;采用排水固结施工技术将地基土层中的水分排出;利用化学物质,使地基中的土层相互粘结,然后利用机械设备搅和土层;确定桩位,结合施工图纸利用钢尺和经纬仪确定测放位置,并且利用木桩做好标记;利用吊运桩技术,结合施工顺序和管桩长度堆放管桩,将垫木层摆设在地面和管桩之间;利用桩基础成孔方式打孔,设置桩基础。本发明通过对地基基础和桩基础进行处理,提高了地基强度,提升了建筑的稳定性和承载力,且还可以提高建筑的抗震性,保障了整体施工的质量。
Civil construction method for ground foundation and pile foundation of high-rise building
一种高层建筑地基基础和桩基础的土建施工方法
WANG JIUXIN (author) / GE JIAYI (author) / FENG YONGFANG (author) / WANG JUNYI (author)
2020-09-22
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
High-rise building foundation pile foundation construction method
European Patent Office | 2021
|Reinforcement method for pile foundation construction for high-rise building foundation construction
European Patent Office | 2021
|High-rise building foundation pile foundation setting method
European Patent Office | 2022
|Civil engineering building foundation pile construction equipment
European Patent Office | 2022
|