The invention relates to a 5G communication line pole and tower installation and reinforcement method. A communication line pole and tower installation and reinforcement device is adopted. The communication line pole and tower installation and reinforcement device comprises a support frame, a sliding block, a reinforcement support plate, a compaction mechanism, a push plate and a conduction rod. The communication line pole and tower installation and reinforcement method using the communication line pole and tower installation and reinforcement device comprises the following steps of S1, pole and tower positioning; S2, support frame positioning; S3, concrete pouring; S4, uniform spreading and compacting of concrete; and S5, concrete leveling. The method can solve the following problems thatwhen existing poles and towers are subjected to concrete reinforcement, manual compaction is adopted for concrete in a foundation pit, the manual labor intensity is increased, manual compaction in different directions cannot be comprehensively carried out on the concrete, the compactness of the concrete is low, and the concrete needs to be evenly spread manually during concrete pouring.
本发明涉及一种基于5G通讯通信线路杆塔安装加固施工方法,该通信线路杆塔安装加固施工方法采用如下通信杆塔安装加固装置,该通信杆塔安装加固装置包括支撑架、滑动块、加固支板、振实机构、推送板和传导杆;采用上述通信杆塔安装加固装置通讯通信线路杆塔的安装加固施工方法,包括以下步骤:S1、杆塔定位;S2、支撑架定位;S3、混凝土浇筑;S4、混凝土摊匀振实S5、混凝土平整。本发明可以解决现有杆塔进行混凝土加固施工时存在的:基坑内的混凝土采用人工振实会增加人工劳动强度,人工无法全面的对混凝土进行不同方位的振实,造成混凝土的密实度低,混凝土进行浇筑时需要人工将混凝土进行摊匀等问题。
5G communication line pole and tower installation and reinforcement method
The invention relates to a 5G communication line pole and tower installation and reinforcement method. A communication line pole and tower installation and reinforcement device is adopted. The communication line pole and tower installation and reinforcement device comprises a support frame, a sliding block, a reinforcement support plate, a compaction mechanism, a push plate and a conduction rod. The communication line pole and tower installation and reinforcement method using the communication line pole and tower installation and reinforcement device comprises the following steps of S1, pole and tower positioning; S2, support frame positioning; S3, concrete pouring; S4, uniform spreading and compacting of concrete; and S5, concrete leveling. The method can solve the following problems thatwhen existing poles and towers are subjected to concrete reinforcement, manual compaction is adopted for concrete in a foundation pit, the manual labor intensity is increased, manual compaction in different directions cannot be comprehensively carried out on the concrete, the compactness of the concrete is low, and the concrete needs to be evenly spread manually during concrete pouring.
本发明涉及一种基于5G通讯通信线路杆塔安装加固施工方法,该通信线路杆塔安装加固施工方法采用如下通信杆塔安装加固装置,该通信杆塔安装加固装置包括支撑架、滑动块、加固支板、振实机构、推送板和传导杆;采用上述通信杆塔安装加固装置通讯通信线路杆塔的安装加固施工方法,包括以下步骤:S1、杆塔定位;S2、支撑架定位;S3、混凝土浇筑;S4、混凝土摊匀振实S5、混凝土平整。本发明可以解决现有杆塔进行混凝土加固施工时存在的:基坑内的混凝土采用人工振实会增加人工劳动强度,人工无法全面的对混凝土进行不同方位的振实,造成混凝土的密实度低,混凝土进行浇筑时需要人工将混凝土进行摊匀等问题。
5G communication line pole and tower installation and reinforcement method
一种基于5G通讯通信线路杆塔安装加固施工方法
GUO SHUNHE (author) / XIA KEXIN (author)
2020-10-13
Patent
Electronic Resource
Chinese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Electric power line single pole tower and installation method thereof
European Patent Office | 2023
|5G communication line tower installation construction method
European Patent Office | 2024
|5G communication line pole and tower mounting construction method
European Patent Office | 2020
|European Patent Office | 2023
|