A platform for research: civil engineering, architecture and urbanism
5G communication line tower installation construction method
The invention discloses a 5G communication line tower mounting construction method, belongs to the technical field of circuit tower construction, and provides the following scheme: by arranging an adjustable rolling assembly, a toothed bar, a gear, an inclined plane control plate and an adjustable limiting assembly, a round handle can be operated and controlled to drive a screw rod to rotate to adjust the height of a roller; secondly, when the pole tower is positioned, the roller moves and is extruded by the inclined plane control plate to generate cloud, the inclined plane control plate drives the toothed bar to be in upward transmission with the gear, so that the inclined plane of the pole tower can be adjusted, and the angle of the inclined plane of the pole tower can be adjusted to adjust the angle of the steering limiting frame to adapt to the inclined plane of the pole tower; the gears can drive the steering limiting frames to steer through the rotating shafts, so that the steering limiting frames can ensure that the balls are attached to the inclined face of the tower through angle adjustment, the contact face with the tower is increased, the four steering limiting frames can fully keep the tower through steering, and therefore accurate positioning of the tower during construction can be improved through the mode.
本发明公开了一种5G通讯通信线路杆塔安装施工方法,属于电路杆塔施工技术领域,现提出如下方案,本发明通过设置可调节滚动组件、齿杆、齿轮、斜面控制板和可调节限位组件,通过操作控制圆柄可带动螺杆旋转调节滚轮的高度,以此可调节滚轮与斜面控制板之间的接触面,从而可实现转向限位架角度调整适应杆塔的斜面的作用,其次,当在对杆塔定位时,使滚轮移动受到斜面控制板挤压产生云东,斜面控制板带动齿杆向上与齿轮传动,齿轮可通过转轴带动转向限位架转向,使转向限位架可通过角度调整确保滚珠贴合在杆塔的斜面上,增加与杆塔的接触面,保持四个转向限位架通过转向可充分对杆塔进行保持,从而该方式可提高对杆塔进行施工时的精准定位。
5G communication line tower installation construction method
The invention discloses a 5G communication line tower mounting construction method, belongs to the technical field of circuit tower construction, and provides the following scheme: by arranging an adjustable rolling assembly, a toothed bar, a gear, an inclined plane control plate and an adjustable limiting assembly, a round handle can be operated and controlled to drive a screw rod to rotate to adjust the height of a roller; secondly, when the pole tower is positioned, the roller moves and is extruded by the inclined plane control plate to generate cloud, the inclined plane control plate drives the toothed bar to be in upward transmission with the gear, so that the inclined plane of the pole tower can be adjusted, and the angle of the inclined plane of the pole tower can be adjusted to adjust the angle of the steering limiting frame to adapt to the inclined plane of the pole tower; the gears can drive the steering limiting frames to steer through the rotating shafts, so that the steering limiting frames can ensure that the balls are attached to the inclined face of the tower through angle adjustment, the contact face with the tower is increased, the four steering limiting frames can fully keep the tower through steering, and therefore accurate positioning of the tower during construction can be improved through the mode.
本发明公开了一种5G通讯通信线路杆塔安装施工方法,属于电路杆塔施工技术领域,现提出如下方案,本发明通过设置可调节滚动组件、齿杆、齿轮、斜面控制板和可调节限位组件,通过操作控制圆柄可带动螺杆旋转调节滚轮的高度,以此可调节滚轮与斜面控制板之间的接触面,从而可实现转向限位架角度调整适应杆塔的斜面的作用,其次,当在对杆塔定位时,使滚轮移动受到斜面控制板挤压产生云东,斜面控制板带动齿杆向上与齿轮传动,齿轮可通过转轴带动转向限位架转向,使转向限位架可通过角度调整确保滚珠贴合在杆塔的斜面上,增加与杆塔的接触面,保持四个转向限位架通过转向可充分对杆塔进行保持,从而该方式可提高对杆塔进行施工时的精准定位。
5G communication line tower installation construction method
一种5G通讯通信线路杆塔安装施工方法
YOU JIANGNAN (author)
2024-09-24
Patent
Electronic Resource
Chinese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
5G communication line pole and tower installation and reinforcement method
European Patent Office | 2020
|Foundation pit construction method of communication iron tower installation foundation
European Patent Office | 2020
|