A platform for research: civil engineering, architecture and urbanism
The invention relates to a construction method of a novel outer wall waterproof protective layer. The method comprises the following steps of 1, cleaning the surface of a waste formwork on a construction site, removing nails on the surface, washing a cement part, selecting the number of formworks as required, and punching holes in four corners of each formwork; 2, bending a reinforcing steel bar into a U shape; 3, connecting every two formworks in a manner that the reinforcing steel bar penetrates through the holes in the formworks; 4, before constructing a waterproof protection layer, payingattention to whether a fixed position exists above a top plate or not, if no fixed position exists, placing I-shaped steel at the tops of the formworks, inserting an iron chain into the holes of the formwork in the uppermost layer in a penetrating manner, connecting with the I-shaped steel, and conveniently fixing the novel waterproof protection layer; and 5, when an outer wall waterproof protection layer is constructed, hoisting the formworks through a tower crane, then carrying out fixing, and backfilling soil. The construction method is convenient and fast to construct and the waterproof layer is effectively protected.
本发明涉及一种新型外墙防水保护层的施工方法,包括如下步骤:步骤一:将施工现场废旧模板进行表面清理,将表面钉子取掉,有水泥处进行冲洗,根据需要选择模板数量,然后将模板四个角点处进行打洞口处理;步骤二:将钢筋弯折成U型形状;步骤三:两两模板之间通过钢筋穿过模板上的洞口实现连接;步骤四:施工防水保护层前,关注顶板上方有无固定处,如无可固定处,可在模板顶部放置工字钢,用铁链穿插到最上层模板洞口处并连接工字钢,便于固定新型防水保护层;步骤五:待外墙防水保护层施工时,用塔吊吊起模板后进行固定,在回填土。本发明施工方便、快捷、且有效保护防水层。
The invention relates to a construction method of a novel outer wall waterproof protective layer. The method comprises the following steps of 1, cleaning the surface of a waste formwork on a construction site, removing nails on the surface, washing a cement part, selecting the number of formworks as required, and punching holes in four corners of each formwork; 2, bending a reinforcing steel bar into a U shape; 3, connecting every two formworks in a manner that the reinforcing steel bar penetrates through the holes in the formworks; 4, before constructing a waterproof protection layer, payingattention to whether a fixed position exists above a top plate or not, if no fixed position exists, placing I-shaped steel at the tops of the formworks, inserting an iron chain into the holes of the formwork in the uppermost layer in a penetrating manner, connecting with the I-shaped steel, and conveniently fixing the novel waterproof protection layer; and 5, when an outer wall waterproof protection layer is constructed, hoisting the formworks through a tower crane, then carrying out fixing, and backfilling soil. The construction method is convenient and fast to construct and the waterproof layer is effectively protected.
本发明涉及一种新型外墙防水保护层的施工方法,包括如下步骤:步骤一:将施工现场废旧模板进行表面清理,将表面钉子取掉,有水泥处进行冲洗,根据需要选择模板数量,然后将模板四个角点处进行打洞口处理;步骤二:将钢筋弯折成U型形状;步骤三:两两模板之间通过钢筋穿过模板上的洞口实现连接;步骤四:施工防水保护层前,关注顶板上方有无固定处,如无可固定处,可在模板顶部放置工字钢,用铁链穿插到最上层模板洞口处并连接工字钢,便于固定新型防水保护层;步骤五:待外墙防水保护层施工时,用塔吊吊起模板后进行固定,在回填土。本发明施工方便、快捷、且有效保护防水层。
Construction method of novel outer wall waterproof protective layer
新型外墙防水保护层的施工方法
2020-11-10
Patent
Electronic Resource
Chinese
Construction process for waterproof protective layer of overhead basement outer wall
European Patent Office | 2024
|Basement outer wall multi-layer waterproof construction method
European Patent Office | 2024
|European Patent Office | 2022
|WATERPROOF STRUCTURE OF OUTER WALL TILE, AND WATERPROOF CONSTRUCTION METHOD OF OUTER WALL TILE
European Patent Office | 2023
|