A platform for research: civil engineering, architecture and urbanism
The invention discloses a building pile with an adjustable height, belonging to the technical field of building piles. The building pile comprises a building pile body, a bearing table and a handle. The building pile further comprises reinforcing rods and a deviation rectifying device, the bearing table is matched with the building pile body in a threaded mode, the handle is installed on the bearing table, a plurality of reinforcing rods are arranged, a conical ground breaking block is arranged at the bottom of the building pile body, and the deviation rectifying device is located beside the building pile body and comprises a positioning piece and a deviation rectifying piece. When the building pile body is subjected to impact force displacement, a positioning sliding block pushes a connecting rod to enable the deviation rectifying block to move in a positioning block; when the deviation rectifying block moves, a reset spring is stressed and provides a pushing force for the deviation rectifying block, so that the deviation rectifying block is reset; and when the deviation rectifying block resets, the building pile body can be straightened through the connecting rod and the positioning sliding block by means of the pushing force provided by the reset spring, and when the building pile body deviates much during installation, deviation rectifying can be conducted on the building pile body in time by observing the state of the reset spring through a worker.
本发明公开了一种可调节高度的建筑桩,属于建筑桩技术领域,包括建筑桩本体、承托台以及把手,还包括加强杆以及纠偏装置,所述承托台与建筑桩本体螺接配合,把手安装于承托台上,加强杆设有若干个,建筑桩本体的底部设有锥形破土块,纠偏装置位于建筑桩本体旁侧且纠偏装置包括定位件以及纠偏件。本发明当建筑桩本体受冲击力位移,定位滑块推动连接杆使纠偏块在定位块内移动,纠偏块移动时复位弹簧受力并向纠偏块提供推力从而使纠偏块复位,当纠偏块复位时能够将复位弹簧提供的推力通过连接杆和定位滑块对建筑桩本体进行扶正作业,当建筑桩本体在安装时偏移较多,通过工人观测复位弹簧的状态能够及时对建筑桩本体进行纠偏。
The invention discloses a building pile with an adjustable height, belonging to the technical field of building piles. The building pile comprises a building pile body, a bearing table and a handle. The building pile further comprises reinforcing rods and a deviation rectifying device, the bearing table is matched with the building pile body in a threaded mode, the handle is installed on the bearing table, a plurality of reinforcing rods are arranged, a conical ground breaking block is arranged at the bottom of the building pile body, and the deviation rectifying device is located beside the building pile body and comprises a positioning piece and a deviation rectifying piece. When the building pile body is subjected to impact force displacement, a positioning sliding block pushes a connecting rod to enable the deviation rectifying block to move in a positioning block; when the deviation rectifying block moves, a reset spring is stressed and provides a pushing force for the deviation rectifying block, so that the deviation rectifying block is reset; and when the deviation rectifying block resets, the building pile body can be straightened through the connecting rod and the positioning sliding block by means of the pushing force provided by the reset spring, and when the building pile body deviates much during installation, deviation rectifying can be conducted on the building pile body in time by observing the state of the reset spring through a worker.
本发明公开了一种可调节高度的建筑桩,属于建筑桩技术领域,包括建筑桩本体、承托台以及把手,还包括加强杆以及纠偏装置,所述承托台与建筑桩本体螺接配合,把手安装于承托台上,加强杆设有若干个,建筑桩本体的底部设有锥形破土块,纠偏装置位于建筑桩本体旁侧且纠偏装置包括定位件以及纠偏件。本发明当建筑桩本体受冲击力位移,定位滑块推动连接杆使纠偏块在定位块内移动,纠偏块移动时复位弹簧受力并向纠偏块提供推力从而使纠偏块复位,当纠偏块复位时能够将复位弹簧提供的推力通过连接杆和定位滑块对建筑桩本体进行扶正作业,当建筑桩本体在安装时偏移较多,通过工人观测复位弹簧的状态能够及时对建筑桩本体进行纠偏。
Height-adjustable building pipe pile special for building engineering construction
European Patent Office | 2023
|