A platform for research: civil engineering, architecture and urbanism
Climbing formwork system, construction method thereof and climbing formwork supporting device
The invention relates to a climbing formwork system, a construction method thereof and a climbing formwork supporting device. The climbing formwork system comprises a supporting platform, a supportingcolumn, a construction platform and a driving part. The supporting platform comprises a first bottom plate and at least two first supporting parts, and the first supporting parts can extend out of orretract into the first bottom plate. The supporting column is vertically connected to the first bottom plate; the construction platform is arranged outside the supporting column in a sleeving mode, located above the supporting platform and parallel to the supporting platform, the construction platform comprises a second bottom plate and at least two second supporting parts, and a bearing part isarranged on the surface, close to the supporting platform, of the second bottom plate. One end of the driving part is connected with the bearing part, and the other end of the driving part is connected with the supporting column and can move along the supporting column. The double-supporting type design is adopted, safety and reliability are achieved, the structure is simple, the construction platform and the supporting platform move along the supporting column, and the climbing synchronism and stability of the construction platform can be improved. In addition, the construction method of theclimbing formwork system is simple in step, easy to operate and suitable for application and popularization.
本发明涉及一种爬升模架系统、其施工方法、以及爬升模架支撑装置。所述爬升模架系统包括支撑平台、支撑柱、施工平台和驱动部。支撑平台包括第一底板和至少两个第一支撑部,第一支撑部能够伸出或缩入第一底板。支撑柱垂直连接于第一底板;施工平台套设于支撑柱外,施工平台位于支撑平台上方并与支撑平台平行,施工平台包括第二底板和至少两个第二支撑部,第二底板靠近支撑平台的表面设有承重件。驱动部一端与承重件连接,另一端与支撑柱连接并能够沿支撑柱移动。采用双支撑式设计,安全可靠,结构简单,并且施工平台和支撑平台均沿支撑柱移动,有助于提高施工平台爬升的同步性和稳定性。此外,上述爬升模架系统的施工方法步骤简单,容易操作,适于推广应用。
Climbing formwork system, construction method thereof and climbing formwork supporting device
The invention relates to a climbing formwork system, a construction method thereof and a climbing formwork supporting device. The climbing formwork system comprises a supporting platform, a supportingcolumn, a construction platform and a driving part. The supporting platform comprises a first bottom plate and at least two first supporting parts, and the first supporting parts can extend out of orretract into the first bottom plate. The supporting column is vertically connected to the first bottom plate; the construction platform is arranged outside the supporting column in a sleeving mode, located above the supporting platform and parallel to the supporting platform, the construction platform comprises a second bottom plate and at least two second supporting parts, and a bearing part isarranged on the surface, close to the supporting platform, of the second bottom plate. One end of the driving part is connected with the bearing part, and the other end of the driving part is connected with the supporting column and can move along the supporting column. The double-supporting type design is adopted, safety and reliability are achieved, the structure is simple, the construction platform and the supporting platform move along the supporting column, and the climbing synchronism and stability of the construction platform can be improved. In addition, the construction method of theclimbing formwork system is simple in step, easy to operate and suitable for application and popularization.
本发明涉及一种爬升模架系统、其施工方法、以及爬升模架支撑装置。所述爬升模架系统包括支撑平台、支撑柱、施工平台和驱动部。支撑平台包括第一底板和至少两个第一支撑部,第一支撑部能够伸出或缩入第一底板。支撑柱垂直连接于第一底板;施工平台套设于支撑柱外,施工平台位于支撑平台上方并与支撑平台平行,施工平台包括第二底板和至少两个第二支撑部,第二底板靠近支撑平台的表面设有承重件。驱动部一端与承重件连接,另一端与支撑柱连接并能够沿支撑柱移动。采用双支撑式设计,安全可靠,结构简单,并且施工平台和支撑平台均沿支撑柱移动,有助于提高施工平台爬升的同步性和稳定性。此外,上述爬升模架系统的施工方法步骤简单,容易操作,适于推广应用。
Climbing formwork system, construction method thereof and climbing formwork supporting device
爬升模架系统、其施工方法、以及爬升模架支撑装置
HUANG YULIN (author) / ZHANG LONGLONG (author) / ZUO ZIBO (author) / PAN XI (author) / DU XIAOYAN (author) / CHEN DONG (author)
2020-12-04
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Hydraulic climbing formwork and climbing formwork construction method
European Patent Office | 2021
|European Patent Office | 2015
|