A platform for research: civil engineering, architecture and urbanism
Prefabricated anchor cable frame
The invention relates to the technical field of anchoring, in particular to a prefabricated anchor cable frame. The prefabricated anchor cable frame comprises an outer prefabricated frame and an inneranchor cable frame. The position of the outer prefabricated frame is determined according to anchor cable holes marked in the slope surface, so that outer anchor cable preformed holes correspond to mark points in position, then the outer prefabricated frame is fixed to the slope surface through a guide fixing shaft, and the guide fixing shaft is inserted into a slope surface soil layer by applying pressure to the end face of the outer prefabricated frame; and then fixing inserting plates are oppositely inserted into opening grooves, the pressure is applied to the end face of the inner anchorcable frame, reinforcing drill pieces are inserted into the slope surface soil layer, the inner anchor cable frame and the outer prefabricated frame are preliminarily assembled and fixed, then concrete is poured into a pouring cavity of the outer prefabricated frame through reserved hole pouring, and therefore the whole frame is further fixed.
本发明涉及锚固技术领域,具体为一种预制锚索框架,包括外预制框架和内锚索框架;根据坡面上标记的锚索孔确定外预制框架的位置,使得外锚索预留孔与标记点位置对应,然后通过导向固定轴将外预制框架固定在坡面上,通过向外预制框架端面施加压力,将导向固定轴插入坡面土壤层内;然后将固定插板对于插入开口槽内,通过向内锚索框架端面施加压力,将加强钻片插入坡面土壤层内,初步将内锚索框架和外预制框架装配固定,然后通过浇筑预留孔向外预制框架的浇筑腔内浇筑混凝土,从而进一步固定框架整体。
Prefabricated anchor cable frame
The invention relates to the technical field of anchoring, in particular to a prefabricated anchor cable frame. The prefabricated anchor cable frame comprises an outer prefabricated frame and an inneranchor cable frame. The position of the outer prefabricated frame is determined according to anchor cable holes marked in the slope surface, so that outer anchor cable preformed holes correspond to mark points in position, then the outer prefabricated frame is fixed to the slope surface through a guide fixing shaft, and the guide fixing shaft is inserted into a slope surface soil layer by applying pressure to the end face of the outer prefabricated frame; and then fixing inserting plates are oppositely inserted into opening grooves, the pressure is applied to the end face of the inner anchorcable frame, reinforcing drill pieces are inserted into the slope surface soil layer, the inner anchor cable frame and the outer prefabricated frame are preliminarily assembled and fixed, then concrete is poured into a pouring cavity of the outer prefabricated frame through reserved hole pouring, and therefore the whole frame is further fixed.
本发明涉及锚固技术领域,具体为一种预制锚索框架,包括外预制框架和内锚索框架;根据坡面上标记的锚索孔确定外预制框架的位置,使得外锚索预留孔与标记点位置对应,然后通过导向固定轴将外预制框架固定在坡面上,通过向外预制框架端面施加压力,将导向固定轴插入坡面土壤层内;然后将固定插板对于插入开口槽内,通过向内锚索框架端面施加压力,将加强钻片插入坡面土壤层内,初步将内锚索框架和外预制框架装配固定,然后通过浇筑预留孔向外预制框架的浇筑腔内浇筑混凝土,从而进一步固定框架整体。
Prefabricated anchor cable frame
一种预制锚索框架
XU KUI (author) / WANG ZHIFENG (author) / ZHANG JUNHUA (author) / LI CHANGHU (author) / JI HAILONG (author) / LI SHIJIAN (author) / GAO BO (author) / WANG HUSHENG (author) / HU MINGHUA (author) / YU HENGFENG (author)
2020-12-18
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2015
|Temporary fixing frame for mounting prefabricated building anchor plate
European Patent Office | 2020
|Anchor cable structure and anchor cable frame beam construction method
European Patent Office | 2020
|