A platform for research: civil engineering, architecture and urbanism
Integral building equipment for bent cap and stand column of integrated bridge underground pipe gallery
The invention relates to the technical field of building construction, in particular to integral building equipment for a bent cap and stand columns of an integrated bridge underground pipe gallery. The integral building equipment comprises a bent cap positioning mechanism, a stand column positioning mechanism, an infrared positioning mechanism and an inserting mechanism, the bent cap positioningmechanism is detachably mounted in the center of the bent cap and is arranged opposite to the stand column positioning mechanisms at the upper ends of the pair of stand columns in a butt joint state,the stand column positioning mechanism is detachably installed at the top ends of the stand columns and is arranged opposite to the bent cap positioning mechanism in the butt joint state, the two endsof the infrared positioning mechanism are separately installed on the bent cap positioning mechanism and the stand column positioning mechanism and arranged oppositely, the inserting mechanism is installed on the stand column positioning mechanism, the working end is arranged upwards, and the inserting mechanism is in clearance fit with the bent cap positioning mechanism in the working state. According to the scheme, positioning is accurate, dismounting and mounting are convenient, and error-tolerant rate is high.
本发明涉及建筑施工技术领域,具体是涉及一体式桥梁地下管廊的盖梁与立柱的整体式筑造设备,包括有盖梁定位机构、立柱定位机构、红外定位机构和插接机构;盖梁定位机构可拆卸地安装在盖梁的中央位置,对接状态下与一对立柱上端的立柱定位机构相向设置;立柱定位机构可拆卸地安装在立柱的顶端,对接状态下与盖梁定位机构相向设置;红外定位机构两端分别安装在盖梁定位机构和立柱定位机构上且相向设置;插接机构安装在立柱定位机构上,工作端朝上设置,工作状态下与盖梁定位机构间隙配合;该方案定位准确,拆装方便,容错率高。
Integral building equipment for bent cap and stand column of integrated bridge underground pipe gallery
The invention relates to the technical field of building construction, in particular to integral building equipment for a bent cap and stand columns of an integrated bridge underground pipe gallery. The integral building equipment comprises a bent cap positioning mechanism, a stand column positioning mechanism, an infrared positioning mechanism and an inserting mechanism, the bent cap positioningmechanism is detachably mounted in the center of the bent cap and is arranged opposite to the stand column positioning mechanisms at the upper ends of the pair of stand columns in a butt joint state,the stand column positioning mechanism is detachably installed at the top ends of the stand columns and is arranged opposite to the bent cap positioning mechanism in the butt joint state, the two endsof the infrared positioning mechanism are separately installed on the bent cap positioning mechanism and the stand column positioning mechanism and arranged oppositely, the inserting mechanism is installed on the stand column positioning mechanism, the working end is arranged upwards, and the inserting mechanism is in clearance fit with the bent cap positioning mechanism in the working state. According to the scheme, positioning is accurate, dismounting and mounting are convenient, and error-tolerant rate is high.
本发明涉及建筑施工技术领域,具体是涉及一体式桥梁地下管廊的盖梁与立柱的整体式筑造设备,包括有盖梁定位机构、立柱定位机构、红外定位机构和插接机构;盖梁定位机构可拆卸地安装在盖梁的中央位置,对接状态下与一对立柱上端的立柱定位机构相向设置;立柱定位机构可拆卸地安装在立柱的顶端,对接状态下与盖梁定位机构相向设置;红外定位机构两端分别安装在盖梁定位机构和立柱定位机构上且相向设置;插接机构安装在立柱定位机构上,工作端朝上设置,工作状态下与盖梁定位机构间隙配合;该方案定位准确,拆装方便,容错率高。
Integral building equipment for bent cap and stand column of integrated bridge underground pipe gallery
一体式桥梁地下管廊的盖梁与立柱的整体式筑造设备
2020-12-22
Patent
Electronic Resource
Chinese
European Patent Office | 2020
European Patent Office | 2020