A platform for research: civil engineering, architecture and urbanism
Integral building equipment for stand column and reinforcing section of integrated bridge underground pipe gallery
The invention relates to the field of bridge construction equipment, in particular to integral building equipment for a stand column and a reinforcing section of an integrated bridge underground pipegallery. The integral building equipment comprises a first duplex adjusting piece, a second duplex adjusting piece, an interlocking tooth positioner, a positioning frame and longitudinal plug connectors, the adjusting pieces are arranged on the two sides of a stand column mounting base side by side, the first duplex adjusting piece and the second duplex adjusting piece are fixedly connected through a connecting rod, the working end of the interlocking tooth positioner and a pipe gallery steel bar bearing are perpendicularly arranged at the duplex working end of an adjusting rod, the positioning frame is horizontally arranged at the top end of a moving part of the interlocking tooth positioner, positioning cylinders with vertical axes are arranged at the two ends of the positioning frame, the inner diameters of the positioning cylinders are gradually reduced from top to bottom, and the axes of the working ends of the longitudinal plug connectors are vertically and evenly distributed atthe bottom ends of the four corners of the stand column. The equipment is accurate in positioning, and the working efficiency can be improved.
本发明涉及桥梁建筑设备领域,具体是涉及一体式桥梁地下管廊的立柱与加强段的整体式筑造设备,包括有:第一双工调节件和第二双工调节件,所述调节件并排设置在立柱安装基座两侧,且所述第一双工调节件和第二双工调节件之间通过连接杆固定连接;交齿定位器,所述交齿定位器工作端与管廊钢筋轴承垂直设置在所述调节杆双工工作端上;定位架,所述定位架水平设置在交齿定位器移动部顶端,且所述定位架两端设置有轴线竖直的定位筒,所述定位筒内径从上到下逐渐减小;纵向插接件,所述纵向插接件工作端轴线竖直均布在立柱四角底端,该设备定位精准,能够提高工作效率。
Integral building equipment for stand column and reinforcing section of integrated bridge underground pipe gallery
The invention relates to the field of bridge construction equipment, in particular to integral building equipment for a stand column and a reinforcing section of an integrated bridge underground pipegallery. The integral building equipment comprises a first duplex adjusting piece, a second duplex adjusting piece, an interlocking tooth positioner, a positioning frame and longitudinal plug connectors, the adjusting pieces are arranged on the two sides of a stand column mounting base side by side, the first duplex adjusting piece and the second duplex adjusting piece are fixedly connected through a connecting rod, the working end of the interlocking tooth positioner and a pipe gallery steel bar bearing are perpendicularly arranged at the duplex working end of an adjusting rod, the positioning frame is horizontally arranged at the top end of a moving part of the interlocking tooth positioner, positioning cylinders with vertical axes are arranged at the two ends of the positioning frame, the inner diameters of the positioning cylinders are gradually reduced from top to bottom, and the axes of the working ends of the longitudinal plug connectors are vertically and evenly distributed atthe bottom ends of the four corners of the stand column. The equipment is accurate in positioning, and the working efficiency can be improved.
本发明涉及桥梁建筑设备领域,具体是涉及一体式桥梁地下管廊的立柱与加强段的整体式筑造设备,包括有:第一双工调节件和第二双工调节件,所述调节件并排设置在立柱安装基座两侧,且所述第一双工调节件和第二双工调节件之间通过连接杆固定连接;交齿定位器,所述交齿定位器工作端与管廊钢筋轴承垂直设置在所述调节杆双工工作端上;定位架,所述定位架水平设置在交齿定位器移动部顶端,且所述定位架两端设置有轴线竖直的定位筒,所述定位筒内径从上到下逐渐减小;纵向插接件,所述纵向插接件工作端轴线竖直均布在立柱四角底端,该设备定位精准,能够提高工作效率。
Integral building equipment for stand column and reinforcing section of integrated bridge underground pipe gallery
一体式桥梁地下管廊的立柱与加强段的整体式筑造设备
2020-12-22
Patent
Electronic Resource
Chinese
European Patent Office | 2020
European Patent Office | 2020
Underground pipe gallery deformation joint reinforcing device
European Patent Office | 2024
|European Patent Office | 2021
|