A platform for research: civil engineering, architecture and urbanism
Integral building equipment for reinforcing section and standard section of integrated bridge underground pipe gallery
The invention relates to the technical field of bridge building equipment, in particular to integral building equipment for a reinforcing section and a standard section of an integrated bridge underground pipe gallery. The integral building equipment comprises a supporting and guiding assembly, a material moving mechanism, a first supporting vertical plate, a second supporting vertical plate, a first top guiding mechanism, a second top guiding mechanism, a first side guiding mechanism and a second side guiding mechanism, the material moving mechanism is arranged at the top of the supporting and guiding assembly, the first supporting vertical plate and the second supporting vertical plate are arranged on the two sides of the supporting and guiding assembly correspondingly, the first top guiding mechanism and the second top guiding mechanism are arranged on the first supporting vertical plate and the second supporting vertical plate respectively, and the first side guiding mechanism andsecond side guiding mechanism are arranged on the first supporting vertical plate and the second supporting vertical plate respectively. According to the technical scheme, the pipe gallery reinforcingsection and the pipe gallery standard section can be accurately matched, so that reinforcing steel bars in the pipe gallery reinforcing section are smoothly inserted into a pre-buried sleeve in the pipe gallery standard section matched with the pipe gallery reinforcing section.
本发明涉及桥梁筑造设备技术领域,具体是涉及一体式桥梁地下管廊的加强段与标准段的整体式筑造设备,包括:支撑导向组件;物料移动机构,设置于支撑导向组件的顶部,第一支撑立板和第二支撑立板分别设置于支撑导向组件的两侧,第一顶部引导机构和第一顶部引导机构分别设置于第一支撑立板和第二支撑立板上,第一侧部引导机构和第二侧部引导机构分别设置于第一支撑立板和第二支撑立板上,本技术方案可以将管廊加强段和管廊标准端进行精准配合,使得管廊加强段中的钢筋顺利的插入到与其配合的管廊标准端中的预埋套筒内。
Integral building equipment for reinforcing section and standard section of integrated bridge underground pipe gallery
The invention relates to the technical field of bridge building equipment, in particular to integral building equipment for a reinforcing section and a standard section of an integrated bridge underground pipe gallery. The integral building equipment comprises a supporting and guiding assembly, a material moving mechanism, a first supporting vertical plate, a second supporting vertical plate, a first top guiding mechanism, a second top guiding mechanism, a first side guiding mechanism and a second side guiding mechanism, the material moving mechanism is arranged at the top of the supporting and guiding assembly, the first supporting vertical plate and the second supporting vertical plate are arranged on the two sides of the supporting and guiding assembly correspondingly, the first top guiding mechanism and the second top guiding mechanism are arranged on the first supporting vertical plate and the second supporting vertical plate respectively, and the first side guiding mechanism andsecond side guiding mechanism are arranged on the first supporting vertical plate and the second supporting vertical plate respectively. According to the technical scheme, the pipe gallery reinforcingsection and the pipe gallery standard section can be accurately matched, so that reinforcing steel bars in the pipe gallery reinforcing section are smoothly inserted into a pre-buried sleeve in the pipe gallery standard section matched with the pipe gallery reinforcing section.
本发明涉及桥梁筑造设备技术领域,具体是涉及一体式桥梁地下管廊的加强段与标准段的整体式筑造设备,包括:支撑导向组件;物料移动机构,设置于支撑导向组件的顶部,第一支撑立板和第二支撑立板分别设置于支撑导向组件的两侧,第一顶部引导机构和第一顶部引导机构分别设置于第一支撑立板和第二支撑立板上,第一侧部引导机构和第二侧部引导机构分别设置于第一支撑立板和第二支撑立板上,本技术方案可以将管廊加强段和管廊标准端进行精准配合,使得管廊加强段中的钢筋顺利的插入到与其配合的管廊标准端中的预埋套筒内。
Integral building equipment for reinforcing section and standard section of integrated bridge underground pipe gallery
一体式桥梁地下管廊的加强段与标准段的整体式筑造设备
2020-12-22
Patent
Electronic Resource
Chinese
European Patent Office | 2020
European Patent Office | 2021
|European Patent Office | 2020
Underground pipe gallery deformation joint reinforcing device
European Patent Office | 2024
|Multi-section type construction method for underground pipe gallery
European Patent Office | 2024
|