A platform for research: civil engineering, architecture and urbanism
Municipal building foundation pre-buried structure and construction method thereof
The invention discloses a municipal building foundation pre-buried structure and a construction method thereof. The municipal building foundation pre-buried structure comprises a foundation pre-buriedsupporting formwork, a scaffold and a base; primary foundation concrete is poured in the foundation pre-buried supporting formwork; anchor bolts and supporting steel rods are arranged in the primaryfoundation concrete; positioning annular discs are inserted in the anchor bolts and the supporting steel rods; leveling nuts are arranged on the anchor bolts in a threaded connection mode; the base ismechanically split into a plurality of base assemblies; through holes and hoisting holes are formed in the base assemblies; hoisting rods are welded to the lower ends of the hoisting holes; the leveling nuts abut against the lower end faces of the base assemblies; the base assemblies are adjusted through the leveling nuts so that the lower end faces of the base assemblies can abut against the upper ends of the supporting steel rods; the base assemblies are welded with the supporting steel rods after being leveled; and secondary foundation concrete is poured into the foundation embedded supporting formwork. The municipal building foundation pre-buried structure and and construction method thereof have the advantages that the hoisting is convenient, safety risks are reduced, the leveling iseasy and convenient, the mounting precision is easy to control, the positioning mounting performance is good, and the implementation is reasonable, safe and reliable.
本发明公开了一种市政建筑基础预埋结构及其施工方法,包括基础预埋支撑模板、脚手架和基座,基础预埋支撑模板内浇筑有一次基础混凝土,一次基础混凝土内设置有锚栓和支撑钢杆,锚栓和支撑钢杆上插装有定位环形盘,锚栓上螺纹连接设有调平螺母,基座机械拆分出若干个基座组合件,基座组合件上设置有通孔和吊装孔,吊装孔的下端处焊接有吊装杆,调平螺母抵接在基座组合件的下端面,基座组合件通过调平螺母调节使其下端面下达抵接在支撑钢杆的上端部,基座组合件调平后其之间进行相互焊接,基础预埋支撑模板内浇筑有二次基础混凝土。本发明具有吊装方便、降低安全风险性、调平简便、安装精度容易控制、定位安装性好、实施合理性和安全可靠性的特点。
Municipal building foundation pre-buried structure and construction method thereof
The invention discloses a municipal building foundation pre-buried structure and a construction method thereof. The municipal building foundation pre-buried structure comprises a foundation pre-buriedsupporting formwork, a scaffold and a base; primary foundation concrete is poured in the foundation pre-buried supporting formwork; anchor bolts and supporting steel rods are arranged in the primaryfoundation concrete; positioning annular discs are inserted in the anchor bolts and the supporting steel rods; leveling nuts are arranged on the anchor bolts in a threaded connection mode; the base ismechanically split into a plurality of base assemblies; through holes and hoisting holes are formed in the base assemblies; hoisting rods are welded to the lower ends of the hoisting holes; the leveling nuts abut against the lower end faces of the base assemblies; the base assemblies are adjusted through the leveling nuts so that the lower end faces of the base assemblies can abut against the upper ends of the supporting steel rods; the base assemblies are welded with the supporting steel rods after being leveled; and secondary foundation concrete is poured into the foundation embedded supporting formwork. The municipal building foundation pre-buried structure and and construction method thereof have the advantages that the hoisting is convenient, safety risks are reduced, the leveling iseasy and convenient, the mounting precision is easy to control, the positioning mounting performance is good, and the implementation is reasonable, safe and reliable.
本发明公开了一种市政建筑基础预埋结构及其施工方法,包括基础预埋支撑模板、脚手架和基座,基础预埋支撑模板内浇筑有一次基础混凝土,一次基础混凝土内设置有锚栓和支撑钢杆,锚栓和支撑钢杆上插装有定位环形盘,锚栓上螺纹连接设有调平螺母,基座机械拆分出若干个基座组合件,基座组合件上设置有通孔和吊装孔,吊装孔的下端处焊接有吊装杆,调平螺母抵接在基座组合件的下端面,基座组合件通过调平螺母调节使其下端面下达抵接在支撑钢杆的上端部,基座组合件调平后其之间进行相互焊接,基础预埋支撑模板内浇筑有二次基础混凝土。本发明具有吊装方便、降低安全风险性、调平简便、安装精度容易控制、定位安装性好、实施合理性和安全可靠性的特点。
Municipal building foundation pre-buried structure and construction method thereof
一种市政建筑基础预埋结构及其施工方法
LAI MIN (author) / FENG YINGYING (author) / YU JINGJING (author) / JIN HUI (author)
2020-12-22
Patent
Electronic Resource
Chinese
Buried pipe structure below building foundation and drilling construction method thereof
European Patent Office | 2020
|Foundation pit supporting structure for municipal house building construction
European Patent Office | 2023
|Buried pipe construction method suitable for building foundation operation
European Patent Office | 2021
|BUILDING FOUNDATION STRUCTURE AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2018
|BUILDING FOUNDATION STRUCTURE AND CONSTRUCTION METHOD THEREOF
European Patent Office | 2017
|