A platform for research: civil engineering, architecture and urbanism
Preparation technology for prefabricated integral floor slab
The invention relates to a preparation technology for a prefabricated integral floor slab. According to the preparation technology, preparation equipment for the prefabricated integral floor slab is used and comprises a base and a fixing device, and the fixing device is arranged on the upper surface of the base. According to the preparation technology, the following problems existing during manufacturing of trusses of the prefabricated integral floor slab at present can be solved, that is, the problems that the labor amount of workers is too large and the manufacturing quality and the manufacturing efficiency of the trusses are reduced due to the fact that all the existing trusses are manufactured through manual assembling and welding, and a large number of trusses are required for construction of a building are solved, and the problems that the overall bearing capacity of the trusses is unbalanced and the bearing capacity of the floor slab is unbalanced due to the fact that the trusses are used for bearing the stress and workers can hardly achieve the uniform distribution effect on arrangement of triangular steel rings on supporting steel bars are solved.
本发明涉及一种装配整体式楼板制备工艺,其使用了一种装配整体式楼板制备设备,该装配整体式楼板制备设备包括底座与固定装置,底座上表面设置有固定装置。本发明可以解决目前对于装配整体式楼板的桁架进行制作时,存在以下问题:现有的桁架制作全部由人工进行组装焊接而成,对于一栋建筑的施工,所需的桁架的量会非常多,这样会造成工人的劳动量过多,导致桁架的制作质量以及制作效率下降,而且桁架是用来承载受力的,而工人对于支撑钢筋上的三角形钢圈之间的排布很难达到均匀分布的效果,便会导致桁架整体的承载能力不均衡,从而使得楼板的承载能力不均衡问题的出现。
Preparation technology for prefabricated integral floor slab
The invention relates to a preparation technology for a prefabricated integral floor slab. According to the preparation technology, preparation equipment for the prefabricated integral floor slab is used and comprises a base and a fixing device, and the fixing device is arranged on the upper surface of the base. According to the preparation technology, the following problems existing during manufacturing of trusses of the prefabricated integral floor slab at present can be solved, that is, the problems that the labor amount of workers is too large and the manufacturing quality and the manufacturing efficiency of the trusses are reduced due to the fact that all the existing trusses are manufactured through manual assembling and welding, and a large number of trusses are required for construction of a building are solved, and the problems that the overall bearing capacity of the trusses is unbalanced and the bearing capacity of the floor slab is unbalanced due to the fact that the trusses are used for bearing the stress and workers can hardly achieve the uniform distribution effect on arrangement of triangular steel rings on supporting steel bars are solved.
本发明涉及一种装配整体式楼板制备工艺,其使用了一种装配整体式楼板制备设备,该装配整体式楼板制备设备包括底座与固定装置,底座上表面设置有固定装置。本发明可以解决目前对于装配整体式楼板的桁架进行制作时,存在以下问题:现有的桁架制作全部由人工进行组装焊接而成,对于一栋建筑的施工,所需的桁架的量会非常多,这样会造成工人的劳动量过多,导致桁架的制作质量以及制作效率下降,而且桁架是用来承载受力的,而工人对于支撑钢筋上的三角形钢圈之间的排布很难达到均匀分布的效果,便会导致桁架整体的承载能力不均衡,从而使得楼板的承载能力不均衡问题的出现。
Preparation technology for prefabricated integral floor slab
一种装配整体式楼板制备工艺
WANG GUOCHAO (author)
2020-12-29
Patent
Electronic Resource
Chinese
Prefabricated floor slab and prefabricated floor slab structural component
European Patent Office | 2015
|