A platform for research: civil engineering, architecture and urbanism
Ultrahigh concrete-filled steel tube structure dismantling system and construction method
The invention discloses an ultrahigh concrete-filled steel tube structure dismantling system and a construction method. The ultrahigh concrete-filled steel tube structure dismantling system comprisesa cutting device, a moving device, a climbing device and an operation control platform. The climbing device comprises a climbing flipper, a climbing device assembly, a connecting rod and an operationcommand processing device; the moving device comprises moving feet, a moving device assembly, a connecting rod and an operation command processing device; the cutting device comprises a cutting deviceassembly, a water jet scalpel head, a water pipe and an operation command processing device; each operation command processing device adopts a stm32 single-chip microcomputer and is embedded in the cutting device, the climbing device and the moving device respectively; and the cutting device is connected with the climbing device or the moving device through bolts. The ultrahigh concrete-filled steel tube structure dismantling system belongs to the field of civil engineering, and is convenient to construct, high in construction efficiency, green and environmentally friendly.
本发明公开了超高钢管混凝土结构拆除系统及施工方法,包括切割装置、移动装置、攀附装置和操作控制平台四大部分。攀附装置包括攀附脚蹼,攀附装置组件,连接杆和操作命令处理装置;移动装置包括移动脚、移动装置组件、连接杆和操作命令处理装置;切割装置包括切割装置组件、水刀枪头、水管及操作命令处理装置;操作命令处理装置采用stm32单片机,内嵌于切割装置、攀附装置和移动装置中;切割装置与攀附装置或移动装置通过螺栓连接。所述超高钢管混凝土结构拆除系统属于土木工程领域,施工便捷,施工效率高,绿色环保。
Ultrahigh concrete-filled steel tube structure dismantling system and construction method
The invention discloses an ultrahigh concrete-filled steel tube structure dismantling system and a construction method. The ultrahigh concrete-filled steel tube structure dismantling system comprisesa cutting device, a moving device, a climbing device and an operation control platform. The climbing device comprises a climbing flipper, a climbing device assembly, a connecting rod and an operationcommand processing device; the moving device comprises moving feet, a moving device assembly, a connecting rod and an operation command processing device; the cutting device comprises a cutting deviceassembly, a water jet scalpel head, a water pipe and an operation command processing device; each operation command processing device adopts a stm32 single-chip microcomputer and is embedded in the cutting device, the climbing device and the moving device respectively; and the cutting device is connected with the climbing device or the moving device through bolts. The ultrahigh concrete-filled steel tube structure dismantling system belongs to the field of civil engineering, and is convenient to construct, high in construction efficiency, green and environmentally friendly.
本发明公开了超高钢管混凝土结构拆除系统及施工方法,包括切割装置、移动装置、攀附装置和操作控制平台四大部分。攀附装置包括攀附脚蹼,攀附装置组件,连接杆和操作命令处理装置;移动装置包括移动脚、移动装置组件、连接杆和操作命令处理装置;切割装置包括切割装置组件、水刀枪头、水管及操作命令处理装置;操作命令处理装置采用stm32单片机,内嵌于切割装置、攀附装置和移动装置中;切割装置与攀附装置或移动装置通过螺栓连接。所述超高钢管混凝土结构拆除系统属于土木工程领域,施工便捷,施工效率高,绿色环保。
Ultrahigh concrete-filled steel tube structure dismantling system and construction method
超高钢管混凝土结构拆除系统及施工方法
QIN HONGGUO (author) / YANG XIONG (author) / LI PING (author) / LI WANGPING (author) / CHENG ZHAO (author) / ZHANG ZHICHAO (author) / SHI YAN (author)
2021-01-01
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Dismantling method for concrete-filled steel tube arch bridge
European Patent Office | 2024
|Demolition and construction integrated dismantling method for concrete-filled steel tube arch bridge
European Patent Office | 2023
|Reinforced concrete-filled steel tube structure system and construction method
European Patent Office | 2024
|Steel structure and construction method using concrete filled steel tube
European Patent Office | 2024
|European Patent Office | 2021
|