Integrally poured house building construction process
The invention relates to an integrally poured house building construction process which comprises the following steps of 1, foundation treatment, specifically, cleaning floating sand and mud in a site, compacting a foundation, and arranging a drainage ditch; 2, concrete pouring, specifically, conveying stirred concrete to a pouring point through a conveying pipe on a distributing rod, enabling theconcrete to be vibrated and compacted through a vibrating rod, thereby achieving pouring; and 3, curing, specifically, curing the poured concrete. Firstly, working parameters of a first pouring layerand the preset concrete strength of each pouring layer are determined according to the environment, and the actual strength of the concrete poured according to the working parameters of the first pouring layer is compared with the preset concrete strength, so that in the process of repouring the first pouring layer or adjusting working parameters of a next pouring layer, the strength of the concrete of each layer is judged by comparing the strength of the concrete of different pouring layers with the preset strength, and the strength of the concrete of a whole house building is guaranteed.
本发明涉及一种一体化浇筑的房屋建筑施工工艺,包括以下步骤:步骤一:地基处理,清理场地内的浮砂和泥浆,压实地基,设置排水沟;步骤二:浇筑混凝土,将搅拌好的混凝土通过布料杆上的输送管输送至浇筑点,并通过振捣棒将混凝土振捣密实,实现浇筑;步骤三:养护,对浇筑后的混凝土进行养护;首先根据环境确定第一浇筑层的工作参数和预设每层浇筑层的混凝土强度,根据第一浇筑层的工作参数浇筑出的混凝土的实际强度与预设混凝土强度进行比较,从而对第一浇筑层进行重新浇筑或对下一浇筑层的工作参数进行调整的过程,从不同浇筑层的混凝土强度与预设强度的比较,判断每层混凝土的强度,从而保证整体房屋建筑的混凝土强度。
Integrally poured house building construction process
The invention relates to an integrally poured house building construction process which comprises the following steps of 1, foundation treatment, specifically, cleaning floating sand and mud in a site, compacting a foundation, and arranging a drainage ditch; 2, concrete pouring, specifically, conveying stirred concrete to a pouring point through a conveying pipe on a distributing rod, enabling theconcrete to be vibrated and compacted through a vibrating rod, thereby achieving pouring; and 3, curing, specifically, curing the poured concrete. Firstly, working parameters of a first pouring layerand the preset concrete strength of each pouring layer are determined according to the environment, and the actual strength of the concrete poured according to the working parameters of the first pouring layer is compared with the preset concrete strength, so that in the process of repouring the first pouring layer or adjusting working parameters of a next pouring layer, the strength of the concrete of each layer is judged by comparing the strength of the concrete of different pouring layers with the preset strength, and the strength of the concrete of a whole house building is guaranteed.
本发明涉及一种一体化浇筑的房屋建筑施工工艺,包括以下步骤:步骤一:地基处理,清理场地内的浮砂和泥浆,压实地基,设置排水沟;步骤二:浇筑混凝土,将搅拌好的混凝土通过布料杆上的输送管输送至浇筑点,并通过振捣棒将混凝土振捣密实,实现浇筑;步骤三:养护,对浇筑后的混凝土进行养护;首先根据环境确定第一浇筑层的工作参数和预设每层浇筑层的混凝土强度,根据第一浇筑层的工作参数浇筑出的混凝土的实际强度与预设混凝土强度进行比较,从而对第一浇筑层进行重新浇筑或对下一浇筑层的工作参数进行调整的过程,从不同浇筑层的混凝土强度与预设强度的比较,判断每层混凝土的强度,从而保证整体房屋建筑的混凝土强度。
Integrally poured house building construction process
一种一体化浇筑的房屋建筑施工工艺
LIU WUXIN (author) / ZHANG WEIGUO (author) / LONG BING (author)
2021-01-08
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
G01N
Untersuchen oder Analysieren von Stoffen durch Bestimmen ihrer chemischen oder physikalischen Eigenschaften
,
INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
/
G06F
ELECTRIC DIGITAL DATA PROCESSING
,
Elektrische digitale Datenverarbeitung
Integrally poured building house construction system and construction method
European Patent Office | 2023
|Integrally-poured building house construction device and method
European Patent Office | 2023
|Integrally-poured building house construction structure and method
European Patent Office | 2021
|