A platform for research: civil engineering, architecture and urbanism
Integrally-poured building house construction method
The invention relates to an integrally-poured building house construction method, and aims to solve the technical problems that according to a current traditional integrally-poured building house construction method, horizontal ladder ribs are generally adopted, however, enclosure supporting is not effectively conducted between the horizontal ladder ribs, and consequently the strength of the corner connecting positions between the horizontal ladder ribs is low. A construction method for an integrally-poured building house comprises the following steps that firstly, effective positioning measures of reinforcing steel bars are guaranteed, an upper horizontal ladder bar and a lower horizontal ladder bar are adopted in the horizontal direction of vertical reinforcing steel bars, reinforcing steel bar positioning clamps and cement top formwork bars are adopted in the vertical direction of the vertical reinforcing steel bars, and L-shaped connecting frames are arranged at the corner positions of the different horizontal ladder bars; according to the construction method, the horizontal ladder ribs and the L-shaped connecting frame can be poured together, and therefore the corners of the multiple horizontal ladder ribs are subjected to enclosure reinforcement through the L-shaped connecting frame.
本发明涉及一体化浇筑的建筑房屋施工方法,旨在解决当前传统的一体化浇筑的建筑房屋施工方法,一般都是采用水平梯子筋,但是水平梯子筋之间没有有效的进行围护支撑,导致各个水平梯子筋之间的转角连接处强度较低的技术问题,一体化浇筑的建筑房屋施工方法,包括以下步骤:步骤一:确保钢筋有效的定位措施,竖向钢筋水平方向采用上下两道水平梯子筋,竖向方向采用钢筋定位卡及水泥顶模棒,并且在不同水平梯子筋的转角位置设置L型的连接框架,使转角处的水平梯子筋,分别插入至L型连接框架的两端,本发明能够对水平梯子筋和L型连接框架一同进行浇筑,从而经过L型连接框架对多个水平梯子筋的转角处进行围护加固。
Integrally-poured building house construction method
The invention relates to an integrally-poured building house construction method, and aims to solve the technical problems that according to a current traditional integrally-poured building house construction method, horizontal ladder ribs are generally adopted, however, enclosure supporting is not effectively conducted between the horizontal ladder ribs, and consequently the strength of the corner connecting positions between the horizontal ladder ribs is low. A construction method for an integrally-poured building house comprises the following steps that firstly, effective positioning measures of reinforcing steel bars are guaranteed, an upper horizontal ladder bar and a lower horizontal ladder bar are adopted in the horizontal direction of vertical reinforcing steel bars, reinforcing steel bar positioning clamps and cement top formwork bars are adopted in the vertical direction of the vertical reinforcing steel bars, and L-shaped connecting frames are arranged at the corner positions of the different horizontal ladder bars; according to the construction method, the horizontal ladder ribs and the L-shaped connecting frame can be poured together, and therefore the corners of the multiple horizontal ladder ribs are subjected to enclosure reinforcement through the L-shaped connecting frame.
本发明涉及一体化浇筑的建筑房屋施工方法,旨在解决当前传统的一体化浇筑的建筑房屋施工方法,一般都是采用水平梯子筋,但是水平梯子筋之间没有有效的进行围护支撑,导致各个水平梯子筋之间的转角连接处强度较低的技术问题,一体化浇筑的建筑房屋施工方法,包括以下步骤:步骤一:确保钢筋有效的定位措施,竖向钢筋水平方向采用上下两道水平梯子筋,竖向方向采用钢筋定位卡及水泥顶模棒,并且在不同水平梯子筋的转角位置设置L型的连接框架,使转角处的水平梯子筋,分别插入至L型连接框架的两端,本发明能够对水平梯子筋和L型连接框架一同进行浇筑,从而经过L型连接框架对多个水平梯子筋的转角处进行围护加固。
Integrally-poured building house construction method
一体化浇筑的建筑房屋施工方法
XUE JIANFANG (author) / CHEN JIACAN (author) / XU XIANGJUN (author)
2023-11-03
Patent
Electronic Resource
Chinese
Integrally-poured building house construction device and method
European Patent Office | 2023
|Integrally-poured building house construction structure and method
European Patent Office | 2021
|Integrally poured building house construction system and construction method
European Patent Office | 2023
|