A platform for research: civil engineering, architecture and urbanism
Prefabricated temporary road and construction method
The invention relates to the field of road construction and particularly relates to a prefabricated temporary road and a construction method thereof.The prefabricated temporary road comprises a roadbed used for supporting the road, a plurality of prefabricated plates are arranged at the top end of the roadbed, each prefabricated plate is horizontally arranged at the top end of the roadbed, and a bottom end of each prefabricated plate abuts against the roadbed; an inserting assembly used for fixing is arranged between each prefabricated plate and the roadbed, and a splicing assembly used for connecting is arranged between every two adjacent prefabricated plates. According to the temporary road, the roadbed and the prefabricated slabs are arranged, the prefabricated slabs and the roadbed arefixed through the inserting assemblies, then the adjacent prefabricated slabs are moved to be spliced, the temporary road is formed by splicing the multiple prefabricated slabs, and the effect of shortening the construction period of the temporary road is achieved.
本申请涉及道路施工的领域,尤其是涉及一种预制式临时道路及修建方法,其包括用于支撑道路的路基,所述路基的顶端设置有若干个预制板,每个预制板均水平设置在路基的顶端,每个预制板的底端均与路基抵接,每个预制板与路基之间均设置有用于固定的插接组件,相邻预制板之间设置有用于连接的拼接组件。本申请中,通过设置路基和预制板,利用插接组件将预制板与路基固定,然后再移动相邻的预制板拼接,使临时道路利用若干个预制板拼接而成,具有缩短临时道路施工的周期的效果。
Prefabricated temporary road and construction method
The invention relates to the field of road construction and particularly relates to a prefabricated temporary road and a construction method thereof.The prefabricated temporary road comprises a roadbed used for supporting the road, a plurality of prefabricated plates are arranged at the top end of the roadbed, each prefabricated plate is horizontally arranged at the top end of the roadbed, and a bottom end of each prefabricated plate abuts against the roadbed; an inserting assembly used for fixing is arranged between each prefabricated plate and the roadbed, and a splicing assembly used for connecting is arranged between every two adjacent prefabricated plates. According to the temporary road, the roadbed and the prefabricated slabs are arranged, the prefabricated slabs and the roadbed arefixed through the inserting assemblies, then the adjacent prefabricated slabs are moved to be spliced, the temporary road is formed by splicing the multiple prefabricated slabs, and the effect of shortening the construction period of the temporary road is achieved.
本申请涉及道路施工的领域,尤其是涉及一种预制式临时道路及修建方法,其包括用于支撑道路的路基,所述路基的顶端设置有若干个预制板,每个预制板均水平设置在路基的顶端,每个预制板的底端均与路基抵接,每个预制板与路基之间均设置有用于固定的插接组件,相邻预制板之间设置有用于连接的拼接组件。本申请中,通过设置路基和预制板,利用插接组件将预制板与路基固定,然后再移动相邻的预制板拼接,使临时道路利用若干个预制板拼接而成,具有缩短临时道路施工的周期的效果。
Prefabricated temporary road and construction method
一种预制式临时道路及修建方法
WEI XINGFU (author) / GAO XINMING (author) / TANG HUI (author) / DU GUOZHAN (author)
2021-01-29
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Prefabricated loading temporary road system on construction site
European Patent Office | 2022
|Construction method of detachable prefabricated stair temporary handrail
European Patent Office | 2024
|PREFABRICATED TEMPORARY INSTALLATION PROTECTION PATH AND CONSTRUCTION METHOD
European Patent Office | 2022
|Prefabricated base of road or ridge temporary retaining wall
European Patent Office | 2020
|