A platform for research: civil engineering, architecture and urbanism
Prefabricated loading temporary road system on construction site
A prefabricated load-carrying temporary road system on a construction site comprises a plurality of left prefabricated road standard parts and a plurality of right prefabricated road standard parts. The left prefabricated road standard part and the right prefabricated road standard part respectively comprise a horizontal plate body, the front side of each plate body is provided with a plurality of protruding tenons, the rear side of each plate body is provided with mortises, and the left prefabricated road standard part and the right prefabricated road standard part are respectively provided with a transverse water tank in the left-right direction; drainage through holes are formed in the positions, corresponding to the water tanks, of the riffled plate, the left side prefabricated road standard part and the right side prefabricated road standard part are linearly arranged in the front-back direction and are in end-to-end mortise and tenon joint fit, the left side prefabricated road standard part and the right side prefabricated road standard part are in one-to-one correspondence in the left-right direction and are in mortise and tenon joint fit, and the two transverse water tanks opposite in position are communicated to form a transverse through groove in the left-right direction. The system adopts industrial prefabrication production, is not influenced by external environment, and is high in production efficiency and simple and convenient to maintain and replace.
一种施工现场预制载重临时道路系统,包括若干左侧预制道路标准件和若干右侧预制道路标准件;他们均包括水平板体,板体前侧均设有若干突出的榫头、后侧均设有榫槽,均设有左右走向的横向水槽,左侧左侧预制道路标准件设有纵向水槽,左侧预制道路标准件和右侧预制道路标准件上设有花纹钢板,通过螺栓连接,花纹钢板对应水槽处设有排水通孔,左侧、右侧预制道路标准件沿前后向一字型排列,首尾榫卯配合,左侧、右侧预制道路标准件沿左右向一一对应并榫卯配合,且位置相对的两个横向水槽连通形成一个左右走向的横向通槽。本系统采用工业化预制生产,不受外部环境影响,生产效率高,维修、替换简单方便。
Prefabricated loading temporary road system on construction site
A prefabricated load-carrying temporary road system on a construction site comprises a plurality of left prefabricated road standard parts and a plurality of right prefabricated road standard parts. The left prefabricated road standard part and the right prefabricated road standard part respectively comprise a horizontal plate body, the front side of each plate body is provided with a plurality of protruding tenons, the rear side of each plate body is provided with mortises, and the left prefabricated road standard part and the right prefabricated road standard part are respectively provided with a transverse water tank in the left-right direction; drainage through holes are formed in the positions, corresponding to the water tanks, of the riffled plate, the left side prefabricated road standard part and the right side prefabricated road standard part are linearly arranged in the front-back direction and are in end-to-end mortise and tenon joint fit, the left side prefabricated road standard part and the right side prefabricated road standard part are in one-to-one correspondence in the left-right direction and are in mortise and tenon joint fit, and the two transverse water tanks opposite in position are communicated to form a transverse through groove in the left-right direction. The system adopts industrial prefabrication production, is not influenced by external environment, and is high in production efficiency and simple and convenient to maintain and replace.
一种施工现场预制载重临时道路系统,包括若干左侧预制道路标准件和若干右侧预制道路标准件;他们均包括水平板体,板体前侧均设有若干突出的榫头、后侧均设有榫槽,均设有左右走向的横向水槽,左侧左侧预制道路标准件设有纵向水槽,左侧预制道路标准件和右侧预制道路标准件上设有花纹钢板,通过螺栓连接,花纹钢板对应水槽处设有排水通孔,左侧、右侧预制道路标准件沿前后向一字型排列,首尾榫卯配合,左侧、右侧预制道路标准件沿左右向一一对应并榫卯配合,且位置相对的两个横向水槽连通形成一个左右走向的横向通槽。本系统采用工业化预制生产,不受外部环境影响,生产效率高,维修、替换简单方便。
Prefabricated loading temporary road system on construction site
一种施工现场预制载重临时道路系统
WU XIANFENG (author) / LIU SHUANGFEI (author) / HAN DONG (author) / ZHEN ZHEN (author) / XUE MENG (author) / YU CHENGYUN (author) / ZHANG XINRUI (author) / CHEN JIANG (author) / CAO CUNKUAN (author)
2022-11-08
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
Construction technology of reusable prefabricated road on construction site
European Patent Office | 2023
|Construction site temporary road construction method based on muck
European Patent Office | 2023
|