A platform for research: civil engineering, architecture and urbanism
Construction method for integrally blocking polluted land
The invention relates to a construction method for integrally blocking polluted land. The construction method comprises the following steps of investigating the surrounding conditions of the pollutedland on site, accurately mastering a pile wall construction route, overground and underground structure conditions and an operation space, and determining construction machinery according to the distance of the operation space, facilities during construction and underground structures. The construction method is suitable for various complex working conditions, various processes are closely matched, the construction period is greatly shortened, the closing time of a continuous pile wall is shortened, and the diffusion risk of land pollutants is effectively reduced.
本发明涉及一种污染地块整体阻隔的施工方法,包括以下步骤,实地勘察污染地块周边状况,准确掌握桩墙施工路线、地上和地下构筑物情况以及作业空间;根据作业空间的距离、施工作业中遇到的设施以及地下构筑物,确定施工的机械;本发明适用各种复杂工况,多种工艺紧密配合,大大缩短工期,加快连续桩墙的闭合时间,有效降低地块污染物的扩散风险。
Construction method for integrally blocking polluted land
The invention relates to a construction method for integrally blocking polluted land. The construction method comprises the following steps of investigating the surrounding conditions of the pollutedland on site, accurately mastering a pile wall construction route, overground and underground structure conditions and an operation space, and determining construction machinery according to the distance of the operation space, facilities during construction and underground structures. The construction method is suitable for various complex working conditions, various processes are closely matched, the construction period is greatly shortened, the closing time of a continuous pile wall is shortened, and the diffusion risk of land pollutants is effectively reduced.
本发明涉及一种污染地块整体阻隔的施工方法,包括以下步骤,实地勘察污染地块周边状况,准确掌握桩墙施工路线、地上和地下构筑物情况以及作业空间;根据作业空间的距离、施工作业中遇到的设施以及地下构筑物,确定施工的机械;本发明适用各种复杂工况,多种工艺紧密配合,大大缩短工期,加快连续桩墙的闭合时间,有效降低地块污染物的扩散风险。
Construction method for integrally blocking polluted land
一种污染地块整体阻隔的施工方法
MA JUNJUN (author) / HAN ZHENGCHANG (author) / TAO ZHIHUI (author) / BU XULING (author) / ZHU JIAMING (author) / ZHANG SHOUBING (author) / ZHOU XIAO (author)
2021-02-02
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Polluted site vertical blocking system and construction method
European Patent Office | 2020
|Construction on polluted and marginal land
British Library Online Contents | 1992