A platform for research: civil engineering, architecture and urbanism
Steel wire mesh carrying assembly, composite wallboard and wallboard construction method
The invention discloses a steel wire mesh carrying assembly, a composite wallboard and a wallboard construction method. The carrying assembly comprises a carrying mechanism and web penetrating nails,the carrying mechanism comprises a back plate, a mounting hole and a clamping piece are arranged on the back plate, a locking piece is arranged in the mounting hole, and the clamping piece is used forclamping a steel wire mesh; and the carrying assembly comprises an anchoring state, in the anchoring state, the web penetrating nails penetrate through the mounting holes of the carrying mechanisms on the two sides of the wallboard, and the locking pieces in the mounting holes of at least one carrying mechanism compress the web penetrating nails and prevent the web penetrating nails from retreating. The connecting mode that the carrying mechanisms anchor the web penetrating nails and are connected with the steel wire net meshes in a clamped mode is adopted, traditional welding of the steel wire meshes and the steel bars is replaced, workers can achieve rapid and stable connection without fine welding operation, the working efficiency is remarkably improved, and the working hours are greatly shortened.
钢丝网片搭载组件、复合墙板及墙板施工方法,搭载组件包括搭载机构和穿腹钉,搭载机构包括背板,背板上设置有安装孔和卡接件,安装孔内设置有锁紧片,卡接件用于卡接钢丝网片;搭载组件包括锚固状态,在锚固状态下,穿腹钉贯穿墙板两侧的搭载机构的安装孔,至少一个搭载机构的安装孔内的锁紧片压紧穿腹钉并阻止穿腹钉回退。本发明采用搭载机构锚固穿腹钉、卡接钢丝网片的连接方式,代替了传统的钢丝网片和钢筋焊接,使得工作人员无需精细的焊接操作即可实现快速、稳定的连接,显著地提高了工作效率,并大幅地缩短了工时。
Steel wire mesh carrying assembly, composite wallboard and wallboard construction method
The invention discloses a steel wire mesh carrying assembly, a composite wallboard and a wallboard construction method. The carrying assembly comprises a carrying mechanism and web penetrating nails,the carrying mechanism comprises a back plate, a mounting hole and a clamping piece are arranged on the back plate, a locking piece is arranged in the mounting hole, and the clamping piece is used forclamping a steel wire mesh; and the carrying assembly comprises an anchoring state, in the anchoring state, the web penetrating nails penetrate through the mounting holes of the carrying mechanisms on the two sides of the wallboard, and the locking pieces in the mounting holes of at least one carrying mechanism compress the web penetrating nails and prevent the web penetrating nails from retreating. The connecting mode that the carrying mechanisms anchor the web penetrating nails and are connected with the steel wire net meshes in a clamped mode is adopted, traditional welding of the steel wire meshes and the steel bars is replaced, workers can achieve rapid and stable connection without fine welding operation, the working efficiency is remarkably improved, and the working hours are greatly shortened.
钢丝网片搭载组件、复合墙板及墙板施工方法,搭载组件包括搭载机构和穿腹钉,搭载机构包括背板,背板上设置有安装孔和卡接件,安装孔内设置有锁紧片,卡接件用于卡接钢丝网片;搭载组件包括锚固状态,在锚固状态下,穿腹钉贯穿墙板两侧的搭载机构的安装孔,至少一个搭载机构的安装孔内的锁紧片压紧穿腹钉并阻止穿腹钉回退。本发明采用搭载机构锚固穿腹钉、卡接钢丝网片的连接方式,代替了传统的钢丝网片和钢筋焊接,使得工作人员无需精细的焊接操作即可实现快速、稳定的连接,显著地提高了工作效率,并大幅地缩短了工时。
Steel wire mesh carrying assembly, composite wallboard and wallboard construction method
钢丝网片搭载组件、复合墙板及墙板施工方法
LUO YEFU (author) / ZHANG MINGQIANG (author)
2021-02-26
Patent
Electronic Resource
Chinese
IPC:
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
Assembly type steel wire mesh reinforced light ceramsite wallboard
European Patent Office | 2021
|Installation construction method of composite wallboard and composite wallboard
European Patent Office | 2022
|European Patent Office | 2023
|European Patent Office | 2023
|