A platform for research: civil engineering, architecture and urbanism
Installation construction method of composite wallboard and composite wallboard
The installation construction method of the composite wallboard comprises the following steps that construction paying-off is conducted according to the specification and size of the composite wallboard, and the installation position of the composite wallboard is determined; a bracket beam is fixed according to the installation position determined by construction paying-off, and an installation through hole used for fixing the composite wallboard is formed in the bracket beam in advance; a fixing pin is put into the strip-shaped opening of the composite wallboard or the mounting through hole in the upper end of the bracket beam and is in pin joint between the mounting fixing hole of the composite wallboard and the mounting through hole of the bracket beam; grouting and spreading are conducted from the strip-shaped opening of the composite wallboard; repairing slab joints and treating wall surfaces. At least one ALC laminate is pasted with the mortar, so that the composite wallboard with the ALC layer and the concrete layer at the same time is formed, and in addition, the invention further discloses the composite wallboard applied to the construction method. The method has the advantages that the construction difficulty can be reduced, the construction efficiency can be improved, and the connection strength of the composite wallboard can be guaranteed.
本发明首先公开一种复合墙板的安装施工方法,包括以下步骤:根据复合墙板的规格尺寸施工放线,确定复合墙板安装位置;根据施工放线所确定安装位置固定牛腿梁,所述牛腿梁上预先开设有用于固定复合墙板的安装通孔;从复合墙板的条形敞口中或从牛腿梁上端的安装通孔中放入固定销并使其销接在复合墙板的安装固定孔和牛腿梁的安装通孔之间;从复合墙板的条形敞口中灌浆敷平;板缝修补及墙面处理。砂浆粘贴至少一块ALC层板,使其形成同时具备ALC层和混凝土层的复合墙板,此外,本发明还公开了一种应用于上述施工方法的复合墙板。其效果是:可以将降低施工难度,提高施工效率,并能保障复合墙板的连接强度。
Installation construction method of composite wallboard and composite wallboard
The installation construction method of the composite wallboard comprises the following steps that construction paying-off is conducted according to the specification and size of the composite wallboard, and the installation position of the composite wallboard is determined; a bracket beam is fixed according to the installation position determined by construction paying-off, and an installation through hole used for fixing the composite wallboard is formed in the bracket beam in advance; a fixing pin is put into the strip-shaped opening of the composite wallboard or the mounting through hole in the upper end of the bracket beam and is in pin joint between the mounting fixing hole of the composite wallboard and the mounting through hole of the bracket beam; grouting and spreading are conducted from the strip-shaped opening of the composite wallboard; repairing slab joints and treating wall surfaces. At least one ALC laminate is pasted with the mortar, so that the composite wallboard with the ALC layer and the concrete layer at the same time is formed, and in addition, the invention further discloses the composite wallboard applied to the construction method. The method has the advantages that the construction difficulty can be reduced, the construction efficiency can be improved, and the connection strength of the composite wallboard can be guaranteed.
本发明首先公开一种复合墙板的安装施工方法,包括以下步骤:根据复合墙板的规格尺寸施工放线,确定复合墙板安装位置;根据施工放线所确定安装位置固定牛腿梁,所述牛腿梁上预先开设有用于固定复合墙板的安装通孔;从复合墙板的条形敞口中或从牛腿梁上端的安装通孔中放入固定销并使其销接在复合墙板的安装固定孔和牛腿梁的安装通孔之间;从复合墙板的条形敞口中灌浆敷平;板缝修补及墙面处理。砂浆粘贴至少一块ALC层板,使其形成同时具备ALC层和混凝土层的复合墙板,此外,本发明还公开了一种应用于上述施工方法的复合墙板。其效果是:可以将降低施工难度,提高施工效率,并能保障复合墙板的连接强度。
Installation construction method of composite wallboard and composite wallboard
复合墙板的安装施工方法及复合墙板
XIE ZIQIANG (author) / LI HUAIYU (author) / ZHANG JUNBING (author) / GONG SHU (author) / XIONG RAN (author) / LIU ZHONG (author) / JIANG KAIXUAN (author)
2022-04-08
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Composite wallboard production method and composite wallboard
European Patent Office | 2022
|Composite wallboard preparation method and composite wallboard
European Patent Office | 2022
|