Large-section multi-cabin cast-in-place comprehensive pipe gallery side wall formwork construction system and method
The invention provides a large-section multi-cabin cast-in-place comprehensive pipe gallery side wall formwork construction system and method. A movable side wall steel bar binding jig frame, an overall trolley system, unit type easily-disassembled supporting frames and a formwork perpendicularity monitoring system are arranged; the movable side wall steel bar binding jig frame is arranged on a pipe gallery bottom plate, movable double-side type steel bar binding jig frames are arranged between the adjacent pipe gallery side walls, and movable single-side type steel bar binding jig frames areadditionally arranged on the remaining side walls; the whole trolley system is installed after pipe gallery side wall steel bars are bound, the whole trolley system is adjusted to operate through a trolley sliding rail arranged on the pipe gallery bottom plate, and the formwork perpendicularity monitoring system is arranged on the outer wall of a trolley side formwork; and the unit type easily-disassembled supporting frames are arranged between pipe gallery side wall steel molds in an auxiliary mode. Main components of the large-section multi-cabin cast-in-place comprehensive pipe gallery sidewall formwork system are easy to manufacture and low in cost, the construction advantages of high precision, high efficiency and high benefits are achieved during installation, and the technical benefits are remarkable.
本发明提供了大断面多舱室现浇综合管廊侧墙模板施工体系及施工方法,通过设置可移动式侧墙钢筋绑扎胎架、整体台车系统、单元式易拆撑架及模板垂直度监控系统;移动式侧墙钢筋绑扎胎架设置于管廊底板上,相邻管廊侧墙间设置可移动式双侧型钢筋绑扎胎架,余下侧墙补充设置可移动式单侧型钢筋绑扎胎架;管廊侧墙钢筋绑扎完工后安装整体台车系统,整体台车系统通过管廊底板设置的台车滑轨调整运行,台车侧模外壁上设置有模板垂直度监控系统;管廊侧墙钢模间辅助设置有单元式易拆撑架。本发明所涉及的大断面多舱室现浇综合管廊侧墙模板体系主要构件制作简单、成本低,安装时具有高精度、高效率、高效益的施工优势,技术效益显著。
Large-section multi-cabin cast-in-place comprehensive pipe gallery side wall formwork construction system and method
The invention provides a large-section multi-cabin cast-in-place comprehensive pipe gallery side wall formwork construction system and method. A movable side wall steel bar binding jig frame, an overall trolley system, unit type easily-disassembled supporting frames and a formwork perpendicularity monitoring system are arranged; the movable side wall steel bar binding jig frame is arranged on a pipe gallery bottom plate, movable double-side type steel bar binding jig frames are arranged between the adjacent pipe gallery side walls, and movable single-side type steel bar binding jig frames areadditionally arranged on the remaining side walls; the whole trolley system is installed after pipe gallery side wall steel bars are bound, the whole trolley system is adjusted to operate through a trolley sliding rail arranged on the pipe gallery bottom plate, and the formwork perpendicularity monitoring system is arranged on the outer wall of a trolley side formwork; and the unit type easily-disassembled supporting frames are arranged between pipe gallery side wall steel molds in an auxiliary mode. Main components of the large-section multi-cabin cast-in-place comprehensive pipe gallery sidewall formwork system are easy to manufacture and low in cost, the construction advantages of high precision, high efficiency and high benefits are achieved during installation, and the technical benefits are remarkable.
本发明提供了大断面多舱室现浇综合管廊侧墙模板施工体系及施工方法,通过设置可移动式侧墙钢筋绑扎胎架、整体台车系统、单元式易拆撑架及模板垂直度监控系统;移动式侧墙钢筋绑扎胎架设置于管廊底板上,相邻管廊侧墙间设置可移动式双侧型钢筋绑扎胎架,余下侧墙补充设置可移动式单侧型钢筋绑扎胎架;管廊侧墙钢筋绑扎完工后安装整体台车系统,整体台车系统通过管廊底板设置的台车滑轨调整运行,台车侧模外壁上设置有模板垂直度监控系统;管廊侧墙钢模间辅助设置有单元式易拆撑架。本发明所涉及的大断面多舱室现浇综合管廊侧墙模板体系主要构件制作简单、成本低,安装时具有高精度、高效率、高效益的施工优势,技术效益显著。
Large-section multi-cabin cast-in-place comprehensive pipe gallery side wall formwork construction system and method
大断面多舱室现浇综合管廊侧墙模板施工体系及施工方法
LI WENBING (author) / YAO QIHAI (author) / LIU TONG (author) / HOU KAI (author) / XU LIN (author)
2021-03-05
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Cast-in-place multi-cabin pipe gallery formwork structure and construction method thereof
European Patent Office | 2021
|European Patent Office | 2021
|European Patent Office | 2022
|Outer side formwork and formwork system for comprehensive pipe gallery construction
European Patent Office | 2024
|