A platform for research: civil engineering, architecture and urbanism
Amusement equipment foundation embedded part positioning and mounting construction method
The invention discloses an amusement equipment foundation embedded part positioning and mounting construction method. The amusement equipment foundation embedded part positioning and mounting construction method comprises the following steps of surveying and setting out, foundation bottom-layer steel bar binding, positioning support mounting, embedded part mounting, foundation upper-layer steel bar binding, positioning support fixing and forming, first measuring and rechecking, embedded part fixing and forming, second measuring and rechecking, formwork erecting, third measuring and rechecking,foundation concrete pouring and fourth measuring and rechecking. The amusement equipment foundation embedded part positioning and mounting construction method has the following advantages that 1, a positioning support is adopted for mounting, the mounting precision of the embedded part is ensured, and the construction quality is improved; 2, embedded part construction and civil engineering construction are combined, so that the influence of a civil engineering construction team is avoided, and the embedded part positioning is better ensured; 3, measuring and rechecking are carried out for multiple times before and after concrete pouring to ensure the mounting precision requirements of the positioning support and the embedded part; and 4, the embedded part finished product can be protected, and the safe, high-quality and rapid mounting of amusement equipment is ensured.
本发明公开了一种游乐设备基础预埋件定位安装施工方法,步骤如下:测量放线→基础底层钢筋绑扎→定位支架安装→预埋件安装→基础上层钢筋绑扎→定位支架固定成型→第一次测量复核→预埋件固定成型→第二测量复核→模板支设→第三测量复核→基础混凝土浇筑→第四测量复核。本发明优越性如下:1、采用定位支架安装,保证预埋件安装精度,提高施工质量;2、预埋件施工和土建施工相结合,避免受到土建施工队伍影响,更好地确保预埋件定位;3、混凝土浇筑前后多次测量复核,确保定位支架和预埋件安装的精度要求;4、此方法可以做好预埋件成品保护工作,保证游乐设备安全、高质量、快速地安装完成。
Amusement equipment foundation embedded part positioning and mounting construction method
The invention discloses an amusement equipment foundation embedded part positioning and mounting construction method. The amusement equipment foundation embedded part positioning and mounting construction method comprises the following steps of surveying and setting out, foundation bottom-layer steel bar binding, positioning support mounting, embedded part mounting, foundation upper-layer steel bar binding, positioning support fixing and forming, first measuring and rechecking, embedded part fixing and forming, second measuring and rechecking, formwork erecting, third measuring and rechecking,foundation concrete pouring and fourth measuring and rechecking. The amusement equipment foundation embedded part positioning and mounting construction method has the following advantages that 1, a positioning support is adopted for mounting, the mounting precision of the embedded part is ensured, and the construction quality is improved; 2, embedded part construction and civil engineering construction are combined, so that the influence of a civil engineering construction team is avoided, and the embedded part positioning is better ensured; 3, measuring and rechecking are carried out for multiple times before and after concrete pouring to ensure the mounting precision requirements of the positioning support and the embedded part; and 4, the embedded part finished product can be protected, and the safe, high-quality and rapid mounting of amusement equipment is ensured.
本发明公开了一种游乐设备基础预埋件定位安装施工方法,步骤如下:测量放线→基础底层钢筋绑扎→定位支架安装→预埋件安装→基础上层钢筋绑扎→定位支架固定成型→第一次测量复核→预埋件固定成型→第二测量复核→模板支设→第三测量复核→基础混凝土浇筑→第四测量复核。本发明优越性如下:1、采用定位支架安装,保证预埋件安装精度,提高施工质量;2、预埋件施工和土建施工相结合,避免受到土建施工队伍影响,更好地确保预埋件定位;3、混凝土浇筑前后多次测量复核,确保定位支架和预埋件安装的精度要求;4、此方法可以做好预埋件成品保护工作,保证游乐设备安全、高质量、快速地安装完成。
Amusement equipment foundation embedded part positioning and mounting construction method
一种游乐设备基础预埋件定位安装施工方法
SU XIU (author) / ZHAO TENGFEI (author)
2021-03-09
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Structural equipment foundation embedded part mounting method
European Patent Office | 2024
|Foundation bolt pre-embedded positioning mold and foundation bolt mounting method
European Patent Office | 2021
|European Patent Office | 2020
|Positioning method for rear annular embedded part of equipment foundation
European Patent Office | 2022
|High-precision equipment foundation embedded part construction method
European Patent Office | 2023
|