A platform for research: civil engineering, architecture and urbanism
Fully-prefabricated underground garage construction device and construction method thereof
The invention relates to the technical field of fabricated buildings, and discloses a fully-prefabricated underground garage construction device and a construction method thereof. The fully-prefabricated underground garage construction device comprises a first prefabricated plate and a second prefabricated plate, the first prefabricated plate and the second prefabricated plate are connected through a connecting mechanism, a pre-tightening stabilizing mechanism and a second-order adjacent fastening mechanism are further arranged on the first prefabricated plate; the first prefabricated plate and the second prefabricated plate are moved to be close to each other, so that a first mounting hole in a first transverse plate is aligned with a first screw to enable the first screw to enter the first mounting hole, two first clamping blocks are placed in corresponding grooves to enable the first transverse plate and a second transverse plate to be clamped, and a first circular ring is rotated,so that the first transverse plate and the second transverse plate are jointly pressed on the second prefabricated plate by one lower end face of the first circular ring. The first prefabricated plateand the second prefabricated plate are connected, the first prefabricated plate is moved in the horizontal direction to enable the first screw to enter the first mounting hole, the height of the first prefabricated plate is reduced, energy needed for connecting the first prefabricated plate and the second prefabricated plate is reduced, more energy is saved, and the mounting cost is reduced.
本发明涉及装配式建筑技术领域,且公开了一种全预制装配式地下车库施工设备及其施工方法,包括预制板一和预制板二,预制板一和预制板二之间通过连接机构连接,预制板一上还设置预紧稳固机构和二阶邻间紧固机构,通过移动预制板一向预制板二靠近,将横板一上的安装孔一对准螺杆一,使螺杆一进入安装孔一内,将两个卡块一放入对应的凹槽内,使横板一和横板二卡合,转动圆环一,使横板一和横板二共同体被圆环一下端面压在预制板二上,预制板一和预制板二连接,从水平方向移动预制板一使螺杆一进入安装孔一内,降低升高预制板一的高度,减少连接预制板一和预制板二所需的能量,更加节能,降低安装成本,降低安装成本。
Fully-prefabricated underground garage construction device and construction method thereof
The invention relates to the technical field of fabricated buildings, and discloses a fully-prefabricated underground garage construction device and a construction method thereof. The fully-prefabricated underground garage construction device comprises a first prefabricated plate and a second prefabricated plate, the first prefabricated plate and the second prefabricated plate are connected through a connecting mechanism, a pre-tightening stabilizing mechanism and a second-order adjacent fastening mechanism are further arranged on the first prefabricated plate; the first prefabricated plate and the second prefabricated plate are moved to be close to each other, so that a first mounting hole in a first transverse plate is aligned with a first screw to enable the first screw to enter the first mounting hole, two first clamping blocks are placed in corresponding grooves to enable the first transverse plate and a second transverse plate to be clamped, and a first circular ring is rotated,so that the first transverse plate and the second transverse plate are jointly pressed on the second prefabricated plate by one lower end face of the first circular ring. The first prefabricated plateand the second prefabricated plate are connected, the first prefabricated plate is moved in the horizontal direction to enable the first screw to enter the first mounting hole, the height of the first prefabricated plate is reduced, energy needed for connecting the first prefabricated plate and the second prefabricated plate is reduced, more energy is saved, and the mounting cost is reduced.
本发明涉及装配式建筑技术领域,且公开了一种全预制装配式地下车库施工设备及其施工方法,包括预制板一和预制板二,预制板一和预制板二之间通过连接机构连接,预制板一上还设置预紧稳固机构和二阶邻间紧固机构,通过移动预制板一向预制板二靠近,将横板一上的安装孔一对准螺杆一,使螺杆一进入安装孔一内,将两个卡块一放入对应的凹槽内,使横板一和横板二卡合,转动圆环一,使横板一和横板二共同体被圆环一下端面压在预制板二上,预制板一和预制板二连接,从水平方向移动预制板一使螺杆一进入安装孔一内,降低升高预制板一的高度,减少连接预制板一和预制板二所需的能量,更加节能,降低安装成本,降低安装成本。
Fully-prefabricated underground garage construction device and construction method thereof
一种全预制装配式地下车库施工设备及其施工方法
JI YINGBO (author) / ZHANG RUOHENG (author) / KONG LINGHAI (author) / ZHANG HANSONG (author) / CHEN SHANSHAN (author) / WANG CHANGWANG (author)
2021-03-26
Patent
Electronic Resource
Chinese
Prefabricated overlapped underground garage structure and construction method
European Patent Office | 2024
|Prefabricated part for building underground garage and underground garage
European Patent Office | 2021
|Fully-prefabricated underground diaphragm wall and construction method thereof
European Patent Office | 2023
|