A platform for research: civil engineering, architecture and urbanism
Ultralow-frequency vibration isolation multi-layer filling pile foundation
The invention relates to an ultralow-frequency vibration isolation multi-layer filling pile foundation. The ultralow-frequency vibration isolation multi-layer filling pile foundation comprises a pile core, a soft body layer, a pipe pile, a grouting layer and a bottom sealing block, wherein the pipe pile is formed by sequentially connecting a plurality of prefabricated cylinders with through holes formed along the axis; the pile core is formed by stacking a plurality of reinforced concrete prefabricated cylinders; the soft body layer is clamped between the pipe pile and the pile core; the grouting layer is distributed on the periphery of the pipe pile; and the bottom sealing block is arranged in the pipe pile and located at the bottom of the pipe pile. The multi-layer filling pile foundation is periodically arranged, and ultralow-frequency vibration waves with the specific frequency can be isolated.
本发明涉及一种超低频隔振多层填充桩基,包括桩芯、软体层、管桩、注浆层以及封底块;管桩由多个沿轴线开设通孔的预制圆柱体依次连接而成;桩芯由钢筋混凝土预制多个圆柱体叠加形成;软体层夹设于管桩和桩芯之间;注浆层分布于管桩外围;封底块设置于管桩中,且位于管桩的底部。将该多层填充桩基周期布置,可隔断特定频率的超低频振动波。
Ultralow-frequency vibration isolation multi-layer filling pile foundation
The invention relates to an ultralow-frequency vibration isolation multi-layer filling pile foundation. The ultralow-frequency vibration isolation multi-layer filling pile foundation comprises a pile core, a soft body layer, a pipe pile, a grouting layer and a bottom sealing block, wherein the pipe pile is formed by sequentially connecting a plurality of prefabricated cylinders with through holes formed along the axis; the pile core is formed by stacking a plurality of reinforced concrete prefabricated cylinders; the soft body layer is clamped between the pipe pile and the pile core; the grouting layer is distributed on the periphery of the pipe pile; and the bottom sealing block is arranged in the pipe pile and located at the bottom of the pipe pile. The multi-layer filling pile foundation is periodically arranged, and ultralow-frequency vibration waves with the specific frequency can be isolated.
本发明涉及一种超低频隔振多层填充桩基,包括桩芯、软体层、管桩、注浆层以及封底块;管桩由多个沿轴线开设通孔的预制圆柱体依次连接而成;桩芯由钢筋混凝土预制多个圆柱体叠加形成;软体层夹设于管桩和桩芯之间;注浆层分布于管桩外围;封底块设置于管桩中,且位于管桩的底部。将该多层填充桩基周期布置,可隔断特定频率的超低频振动波。
Ultralow-frequency vibration isolation multi-layer filling pile foundation
一种超低频隔振多层填充桩基
CHEN XIAOBIN (author) / WANG YESHUN (author) / TANG MENGXIONG (author) / LYU JIN (author) / TANG HAO (author) / XIE KANG (author)
2021-04-06
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile-in-row filling type vibration isolation ditch and construction method thereof
European Patent Office | 2020
|European Patent Office | 2021
|Building foundation filling pile construction device and method
European Patent Office | 2020
|Foundation pit pile casing filling device and construction method
European Patent Office | 2022
|Periodic vibration isolation pile for low-frequency vibration waves and construction method
European Patent Office | 2024
|