High-water-pressure soil layer anchor cable supporting construction method
The invention discloses a high-water-pressure soil layer anchor cable supporting construction method. The high-water-pressure soil layer anchor cable supporting construction method comprises the following steps that S1, site investigation is conducted, specifically, the site investigation is conducted on a site, site construction safety is guaranteed, gas pipelines and optical cable lines in a wall are removed, a water supply and power supply site capable of meeting construction requirements is established, a clean and barrier-free construction road is cleaned out, and safety signs are arranged around the site; and S2, drilling operation is conducted, specifically, a drilling machine enters the site and stays at the flat position, if the position is uneven, leveling is conducted, the operation stability of the drilling machine is ensured, a pile casing is buried at the drilling position, and drilling is conducted. The manual labor intensity is effectively reduced, the construction convenience is improved, and the process level is high, so that the installation method of an anchor cable is quick and convenient, has the advantages of stability and high strength, is high in safety and reliability, can be widely popularized, has the effects of high sealing performance and long service life, and effectively improves the adaptability of the anchor cable.
本发明公开了一种高水压土层锚索支护施工工法,包括以下步骤:S1、场地勘查,对场地实施现场勘查保证场地施工安全,排除墙内的燃气管道、光缆线路,并建立能满足施工要求的供水、供电场所,并清理出整洁无障碍的施工道路,并在场地周围设置安全标志;S2、钻孔作业,钻机进场,钻机停留在平整的位置,若是位置不平整率垫平,确保钻机的作业稳定性,在钻孔位置埋设护筒,并进行钻孔。人工劳动力度有效降低,并且提升施工的便捷性,工艺水准高,使得锚索的安装方法不仅快速便捷,还具有稳定、强度高的优点,安全可靠性高,可广泛推广,并且还具有高密封,使用寿命长的效果,有效提升的锚索的适应性。
High-water-pressure soil layer anchor cable supporting construction method
The invention discloses a high-water-pressure soil layer anchor cable supporting construction method. The high-water-pressure soil layer anchor cable supporting construction method comprises the following steps that S1, site investigation is conducted, specifically, the site investigation is conducted on a site, site construction safety is guaranteed, gas pipelines and optical cable lines in a wall are removed, a water supply and power supply site capable of meeting construction requirements is established, a clean and barrier-free construction road is cleaned out, and safety signs are arranged around the site; and S2, drilling operation is conducted, specifically, a drilling machine enters the site and stays at the flat position, if the position is uneven, leveling is conducted, the operation stability of the drilling machine is ensured, a pile casing is buried at the drilling position, and drilling is conducted. The manual labor intensity is effectively reduced, the construction convenience is improved, and the process level is high, so that the installation method of an anchor cable is quick and convenient, has the advantages of stability and high strength, is high in safety and reliability, can be widely popularized, has the effects of high sealing performance and long service life, and effectively improves the adaptability of the anchor cable.
本发明公开了一种高水压土层锚索支护施工工法,包括以下步骤:S1、场地勘查,对场地实施现场勘查保证场地施工安全,排除墙内的燃气管道、光缆线路,并建立能满足施工要求的供水、供电场所,并清理出整洁无障碍的施工道路,并在场地周围设置安全标志;S2、钻孔作业,钻机进场,钻机停留在平整的位置,若是位置不平整率垫平,确保钻机的作业稳定性,在钻孔位置埋设护筒,并进行钻孔。人工劳动力度有效降低,并且提升施工的便捷性,工艺水准高,使得锚索的安装方法不仅快速便捷,还具有稳定、强度高的优点,安全可靠性高,可广泛推广,并且还具有高密封,使用寿命长的效果,有效提升的锚索的适应性。
High-water-pressure soil layer anchor cable supporting construction method
一种高水压土层锚索支护施工工法
ZHANG FENG (author) / WANG HENG (author) / MA PAN (author) / XIN XIAOYU (author) / ZHANG YAO (author) / TAN HAO (author) / LYU JIAN (author) / LI JIANFENG (author) / WANG ZHEN (author)
2021-04-20
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
|Anchor cable supporting system for cave roof soil high slope and construction method
European Patent Office | 2021
|Anchor cable supporting structure and construction method thereof
European Patent Office | 2023
|European Patent Office | 2015
|